本文专门针对该类任务图,提出了一个新的调度算法。
This paper proposes a new algorithm for scheduling an Out-Tree task graph.
给出针对普通任务图带通信限制的基于复制调度算法TDMSCL。
Proposed a duplication based task scheduling algorithm with communication limits for general task graph, TDMSCL.
为此提出了异构任务图的定义,它是异构程序直观和有效描述方法。
This paper proposes an origin definition of heterogeneous task graph, which is a visual and valid description scheme of heterogeneous programs.
还研究了异构任务图的实现模型,它是异构计算环境中软件和硬件的桥梁。
Furthermore, we study an implementing model for heterogeneous task graph, which is the bridge between software and hardware in the environment of heterogeneous computing.
在创建流程的初始模型时,用户通常单击面板中的任务图标,然后在流程图单击以添加任务。
When creating the initial model for a process, users often click on the task icon from the palette, then click in the process diagram to add the task.
一位老师给她的学生们布置了一项有趣的任务——画一幅图来表达他们的感谢。
A teacher gave her class an interesting task—to draw a picture of something to express their thanks.
通过选择相应的复选框选择一个或多个任务(图21)。
Select one or more tasks from the table by selecting the corresponding checkboxes (Figure 21).
图5显示了我们在此任务中要进行的步骤的细节。
Figure 5 shows details of the steps we perform in this task.
图14显示了任务运行的结果。
您还可以打开一项任务来更改它的状态(图19)。
图15显示了这个示例任务。
图8显示了这个示例任务。
图2显示存档任务配置文件设置。
在集成门户环境中,既可以访问任务列表(请参阅图4),也可以处理各项任务。
In the integrated portal environment, one can both access a task list (see Figure 4) and work on tasks.
风险列表由项目管理规程的鉴别并估计风险任务生成的(图2)。
The Risk List is produced by the Identify and Assess Risks task of the Project Management discipline (Figure 2).
对于这些自动删除选项,还可以指定是否只删除成功完成的任务(图4)。
For these automatic deletion options, you can also specify whether a task is only deleted automatically if it completed successfully (Figure 4).
图10:角色,任务,工作产品的核心方法内容概念的简化概念模型。
Figure 10: Simplified conceptual model of the core method content concepts of role, task, and work product.
图1描述了请求、任务、活动,以及工作类型之间的关系。
Figure 1 illustrates relationships among Requests, Tasks, Activities, and Work Types.
将看到允许您设置人工任务容器的对话框(图37)。
You get to the dialog that allows you to set up the Human Task Container (Figure 37).
图3显示了审批任务的升级设置。
Figure 3 illustrates escalation Settings for an approval task.
图12还显示,任务之间的连接现在使用圆角。
As Figure 12 also shows, connections between tasks now use a rounded corner.
例如,图1中显示了审批任务的接口。
Figure 1 shows, as an example, the interface of an approval task.
图7展示了从任务命令到外部ILOGBRMS的交互流。
Figure 7 shows the interaction flow from the task command to the external ILOG BRMS.
概观——三种视角以及用看板图将任务映射到时间。
Three viewpoints and Kanban Board as a mapping of Task to time.
所以,这是一种实现图11的分析任务的途径。
It is therefore a means to the end of achieving the purposes of the analysis task as listed at the top of Figure 11.
图13:添加请求和任务作为这个项目的默认项。
Figure 13: Adding the Request and Task as the default for this project.
准备Daily Scrum会议的一种更加简单地方式,是使用RecentlyModified查询(一种预定义的查询),来识别昨天或者更晚一些时间更改过的任务(图20)。
One way to easily prepare for the Daily Scrum meeting is to use the Recently Modified query (a predefined query) to identify tasks that have been updated in the last day or so (Figure 20).
打开Retrieve人工任务的详细信息(图19)。
如果选择作为任务运行,您将看到图14所示的屏幕。
If you choose to run as a task, you will see the screen shown in Figure 14.
图7:管理任务的过程流。
应用推荐