• How to check the connection correctness of "l", "n", "s" lines is discussed on the shortcomings of on-load test for zero-sequence power direction component.

    针对当前零序功率方向元件带负荷试验不足之处讨论了如何检查L”、“N”及“S线接线正确性

    youdao

  • "Zero-baseline Test" refers to the experiment that links two GPS receivers with the same antenna element through a "Power distributor" and conduct the difference positioning.

    所谓“零基线”检验,就是GPS接收机通过功率分配器连接同一副gps接收机天线上,进行差分定位测量。

    youdao

  • This paper mainly discusses the two operating points for the test of synchronous machines, no-load point and zero power loading point.

    本文主要同步电机试验中的空载功率负载两个特殊工作点的运行工况进行了分析

    youdao

  • This paper mainly discusses the two operating points for the test of synchronous machines, no-load point and zero power loading point.

    本文主要同步电机试验中的空载功率负载两个特殊工作点的运行工况进行了分析

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定