Wind power farm civil construction consists of generator foundation and wind turbine transformer foundation constructions.
风电场的土建施工主要包括发电机的设备基础和风机变压器基础施工。
The main topics mentioned here are about wind turbine, power regulation of wind turbine and induction generator in wind farms with electrical power system.
重点介绍了目前风电场中所采用的风力发电机组,包括风力机、风力机的功率调节及恒速恒频和变速恒频发电系统。
A wind turbine is directly connected to a generator in the direct-drive wind power generation system to improve efficiency and reliability.
直驱式风力发电系统使风力机与发电机之间直接相连,提高系统效率和可靠性。
Generator is the core of the wind turbine, its safe and reliable operation will have a direct bearing on the stability of the whole turbine and power quality.
发电机是风力发电机组的核心,其安全可靠运行将直接关系到整个机组的稳定和电能的质量。
The simulation results indicate that wind turbine is operated at maximum power coefficient with variable-speed mode and the output power of generator is kept around rated power with pitch control.
数字仿真表明,在风速低于额定风速时变速运行捕获能量比恒速运行捕获能量大;节距调节控制可以很好地使输出功率稳定在额定功率左右。
The simulation of a certain domestic 220kV power grid is implemented and a method to decide the LVRT parameters of wind turbine generator and requirement is proposed.
以某地区电网为例进行仿真计算,并提出了一种确定风电机组低电压穿越参数与要求的方法。
The simulation of a certain domestic 220kV power grid is implemented and a method to decide the LVRT parameters of wind turbine generator and requirement is proposed.
以某地区电网为例进行仿真计算,并提出了一种确定风电机组低电压穿越参数与要求的方法。
应用推荐