• The impervious wall of this project is located in water bearing sand and gravel, the collapse hole takes place due to some factor affect, the deep well lower water level measures are adopted.

    工程防渗墙在富含砾石地层施工中,由于各种因素引起严重塌,施工中采用深井井上降水措施

    youdao

  • The impervious wall of this project is located in water bearing sand and gravel, the collapse hole takes place due to some factor affect, the deep well lower water level measures are adopted.

    工程防渗墙在富含砾石地层施工中,由于各种因素引起严重塌,施工中采用深井井上降水措施

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定