• ORP negatively relates to temperature, influent concentration and wastewater filtration rate.

    ORP温度进水浓度污水过滤速度均呈负相关关系;

    youdao

  • The effects of different influent modes on treating result of SBR process were studied through treating brewery wastewater and gourmet powder wastewater by SBR process.

    采用SBR处理啤酒废水味精废水,研究了不同进水方式SBR法处理效果影响

    youdao

  • With the laboratory condition, the paper research the adsorption influent factors of Zinc wastewater, using adsorption performance of the cinder.

    实验室条件下利用煤渣吸附性能,对含锌废水吸附影响因素进行研究

    youdao

  • Therefore, influent salinity must be kept unvarying to realize using DO as the computer control parameter of SBR process treating saline wastewater.

    所以实现DO作为SBR处理含盐污水计算机控制参数必须保证盐度稳定。

    youdao

  • The test results showed that the treatment efficiency of brewery wastewater was better when restricted aeration was used for its influent;

    试验结果表明啤酒废水采用限制气进水效果好,瞬时进水和限制曝气进水效果相当;

    youdao

  • Commutative multi-influent wastewater treatment processs with five tanks for nitrogen and phosphorus removal, a new developed process, consisted of five biochemical reaction tanks and a settling tank.

    论文研究了一种新型污水生物处理工艺——多点交替进水一体化活性污泥法除工艺

    youdao

  • Through the above technological process, the wastewater with rare earth ammonia chloride can meet the requirements of the influent water for membrane process.

    以上工序处理,稀土氯化铵废水达到膜分离装置进水水质要求

    youdao

  • Because the organic loading of the influent of a wastewater treatment plant on the east outskirts of Tangshan is far below the design standards, the ditch can not operate regularly.

    由于唐山污水处理厂进水有机负荷低于设计运行进水条件,致使三氧化沟运行不正常。

    youdao

  • The settling test of influent sample was conducted in Xi"an No. 4 Wastewater Treatment Plant under construction. The settling curve of SS is obtained under different water depths and retention time."

    通过拟建中的西安市第四污水处理厂初池入流污染物沉淀试验得到不同水深沉淀时间ss去除率曲线

    youdao

  • The settling test of influent sample was conducted in Xi"an No. 4 Wastewater Treatment Plant under construction. The settling curve of SS is obtained under different water depths and retention time."

    通过拟建中的西安市第四污水处理厂初池入流污染物沉淀试验得到不同水深沉淀时间ss去除率曲线

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定