• Shutdown structure posited between heating interval and buffering-separating interval and measures for absorption of vibration of the bump are the designing key.

    装置设计关键加热缓冲、分离段之间隔断结构的设计制造和泵的减措施

    youdao

  • Shutdown structure posited between heating interval and buffering-separating interval and measures for absorption of vibration of the bump are the designing key.

    装置设计关键加热缓冲、分离段之间隔断结构的设计制造和泵的减措施

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定