• The center distance of two holes is equal to the center distance of the corresponding venting hole and the water hole of the boiler.

    中心与相应锅炉气孔、通水孔的中心距相等

    youdao

  • The measures to control the vapor purging time and flow rate of vapour, enlarge the oil-gas space and increase the number of air hole as well as venting area are given, which can effective...

    提出采取严格控制线作业时间扫线蒸汽流量增大油气空间体积和增加罐顶气孔数量面积等措施,可有效地预防该类事故的发生。

    youdao

  • The measures to control the vapor purging time and flow rate of vapour, enlarge the oil-gas space and increase the number of air hole as well as venting area are given, which can effective...

    提出采取严格控制线作业时间扫线蒸汽流量增大油气空间体积和增加罐顶气孔数量面积等措施,可有效地预防该类事故的发生。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定