The design control conditions are uplift displacement or uplift load to spread foundation of bearing uplift load.
承受上拔荷载的扩展基础,可以用上拔位移或上拔荷载作为设计控制条件。
The direct or indirect method to determine ultimate uplift load of anchored rod pile is proposed herein based on field tests in association with engineering practice.
本文结合工程实践,通过现场试验分析研究提出锚杆桩抗拔极限荷载直接或间接的确定方法,并提出了合理的施工方案。
The reinforcement scheme which add tension piles and shear walls in the garage was put forward. The calculation results show that the uplift load of the pile greatly reduced after adding shear walls.
提出了在地下车库内增设抗拔桩和剪力墙的加固方案,计算结果显示,增设剪力墙后桩基所受上拔力大幅度降低。
The uplift of wave is the main load imposed on superstructure of the exposed wharf, which has an important effect on the safe service of wharf.
波浪上托力是作用在开敞码头上部结构的主要荷载,对码头的安全使用具有重要影响。
The uplift of wave is the main load imposed on superstructure of the exposed wharf, which has an important effect on the safe service of wharf.
波浪上托力是作用在开敞码头上部结构的主要荷载,对码头的安全使用具有重要影响。
应用推荐