Keeping track of the changes as they are made allows for a reconstruction of the record at a point in time and gives a full audit trail of a given record.
在发生更改时跟踪更改,可以及时重建记录,从而提供特定记录的完整审计轨迹。
Finally, the example of project management culture: the reconstruction project of the electrification in Beijing-Shanghai track line is introduced.
最后,通过实例:京沪线电气化改造工程介绍了项目文化建设的实践。
Finally, the example of project management culture: the reconstruction project of the electrification in Beijing-Shanghai track line is introduced.
最后,通过实例:京沪线电气化改造工程介绍了项目文化建设的实践。
应用推荐