• Shandan cement plant in order to field work standardization in various positions established working management, including working procedure chart and time sequence diagram.

    山丹水泥厂为了现场工作标准化而在各个岗位设立了工作管理图,包括工作程序时间序列分解图。

    youdao

  • In a sequence diagram, the sequence of messages is shown positionally: time proceeds down the page, so a message low in the diagram is sent after a message that is above it.

    一个顺序中,消息顺序用它们位置来表示:按照时间顺序从上到排列,因此排在下面的消息在排在上面的消息之后发生。

    youdao

  • These database calls are shown in the sequence diagram along with the response time for each database hit.

    这些数据库调用显示序列图中并且还会显示每次数据库访问响应时间

    youdao

  • The vertical axis represents time in sequence diagrams, but the timing diagram USES the horizontal axis to represent time.

    垂直线代表序列之中的时间但是计时使用水平线代表时间。

    youdao

  • The reason the sequence diagram is so useful is because it shows the interaction logic between the objects in the system in the time order that the interactions take place.

    序列如此好用理由是,因为按照交互发生的时间顺序显示了系统对象交互逻辑

    youdao

  • This time, we'll explore the role of conditional logic in a generic sequence diagram, thus expanding your knowledge of UML notation.

    一次我们探究条件逻辑常规序列图中所扮演的角色,通过它来让了解有关UML表示更多知识。

    youdao

  • Sequence diagram test cases visualize how the system under test should be interacting with other instances over time.

    序列测试用例显示了,测试之下系统可以其他的实例相交流

    youdao

  • However, a communication diagram focuses more on showing the collaboration of objects than on the time sequence.

    然而通信更看重对象协作而不是时间序列

    youdao

  • You will describe the flow of tasks that needs to be done for the Create a Schedule Definition for the Batch activity in a Sequence Diagram this time, as shown in Figure 15.

    此时Sequence Diagram (序列图表)中描述Batch创建一个Schedule定义活动需要任务流程如图 15 中所示。

    youdao

  • Adds the existence of an object at a particular time to your Sequence diagram.

    时刻存在对象添加序列图中

    youdao

  • A method of separating the TIP data from the HRPT is proposed. The design idea, part of the circuit, time sequence and programming flow diagram are given.

    介绍一种HRPT分离tip数据方法,并给出设计思想部分电路时序程序流程图。

    youdao

  • A method of separating the TIP data from the HRPT is proposed. The design idea, part of the circuit, time sequence and programming flow diagram are given.

    介绍一种HRPT分离tip数据方法,并给出设计思想部分电路时序程序流程图。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定