• But the new fiber-optic backbone should be load tested with new applications and hardware.

    但是新的光纤中枢应该新的应用程序硬件进行负载测试

    youdao

  • Typically, an application is load tested less frequently than it is run on the system test environment.

    运行系统测试环境中相比应用程序进行负载测试的频次更少

    youdao

  • Once the changes have been functionally tested, the application can be load and stress tested once more, followed by another analysis.

    更改进行了功能测试之后,可以再次应用程序进行负载测试压力测试,然后再次进行分析

    youdao

  • It would also reduce the load on equipment, freeing it up for testing other builds that currently are not tested.

    这样做减少设备负载,将它们解放出来用来对其他构建进行测试,而这些测试是我们现在无法进行的。

    youdao

  • The primary nonfunctional areas we tested were usability and performance (load tests), as discussed below.

    我们测试主要非功能领域可用性性能(负载测试),我们将在下面进行讨论

    youdao

  • For example, load test, stress test and performance tests, where the product is tested under high load and each of these tests USES the same system resources from the system.

    例如,在负载测试压力测试性能测试中,产品较高的负载中进行测试,每种测试都使用相同系统资源

    youdao

  • Once this portion is complete and tested, the article guides you through enhancing the job to extract, transform, and load XML data into the DWADMIN.HOLDINGS table.

    这个部分完成经过测试之后本文将带领改进作业提取转换XML数据,然后将其装载DWADMIN . holdings表。

    youdao

  • In this example, the team tested an extreme situation: restarting the entire site prior to releasing a full load against it.

    这个实例测试一种极端情况释放全部负荷之前重启整个站点

    youdao

  • After the simple load test, the object will be tested to ensure it was instantiated properly.

    简单装入测试测试对象确保正确实例化的。

    youdao

  • As the product is tested in heavy load conditions, no other testing can be done on the server.

    较大负载条件下测试产品无法服务器执行其他测试

    youdao

  • The great news is that the DOH provides a good framework and method for registering tests that require a Web browser to load an HTML file that instantiates the widgets to be tested.

    还好DOH注册测试提供了很好的框架方法这些测试一般需要Web浏览器加载HTML文件文件用于实例化要测试的部件。

    youdao

  • It is discusses here, how to control the rotating torque of the magnetic brake, as the load on micromotor tested by microcomputer.

    介绍微电机微型计算机测试中如何控制作为负载粉离合器矩问题。

    youdao

  • Set the switches on MSB to 'Auto' position. Generator is to be tested under no load.

    配电开关设定在自动位置,试验机组没有负载进行

    youdao

  • Impact rupture suface of the composites was observed by scanning electron microscope, and the load deformation temperature and mechanical properties were tested.

    通过扫描电镜观测复合材料冲击断面形貌,测试了复合材料的负荷变形温度力学性能

    youdao

  • The Short Circuit protection should be tested at other load rating.

    短路保护测试其它额定负载时测试。

    youdao

  • The over Voltage protection should be tested at other load rating.

    过压保护测试其它定额负载时测试。

    youdao

  • The ASN group was not different in terms of stiffness and load to failure from the LP group for the number of specimens tested.

    稳定髓内钉标本实验方面表现锁定钢板无异

    youdao

  • To obtain data of the fatigue short cracks progression in large extent, specimens with different circle indentation gauge were tested and different load condition was applied.

    得到范围内疲劳裂纹扩展数据分别不同试样缺口尺寸不同载荷条件进行了疲劳试验

    youdao

  • The barrel temperature field without load is tested and analysis.

    测试分析了该机空载下机筒的温度

    youdao

  • The tested axial strain-load curve coincides well with the calculated axial strain-load curve.

    试验向应变-载荷曲线计算的轴向应变-载荷曲线趋势基本一致。

    youdao

  • To study the axial load behavior of square tube confined HSC short columns, 12 specimens was tested under cyclic axial compression.

    研究钢管约束高强混凝土压力学性能,进行了12个试件循环荷载作用下试验研究。

    youdao

  • In the experiment the strain of concrete, steel bar, steel mesh, composite mortar and the ultimate load carrying capacity are tested.

    试验测量轴压试件极限荷载、混凝土应变钢筋应变、钢筋网应变以及复合砂浆应变。

    youdao

  • To study the lateral bearing behavior, one single diaphragm wall is tested under lateral load.

    研究基础的水平承载特性,对片地下连续进行了水平荷载试验。

    youdao

  • P. S. :The peak current or power should be tested when other output of DC overshoot rated load, and the peak current pulse widens within 100ms.

    峰值电流功率测试其它额定负载时测试,小于100毫秒

    youdao

  • The gravel pile and CFG pile composite foundation is tested, and the load-bearing test of CFG pile is made.

    碎石CFG组合型复合地基进行了检验CFG桩载荷试验

    youdao

  • Based on load transmission mechanism of space truss for pile caps, the simulation of compression struts of pile caps was tested.

    基于桩基空间桁架传机理,进行了台斜杆应力场模拟试验

    youdao

  • During the swelling capacity test of the reinforced soils under load, three different reinforcement ratio samples are tested in order to reduce their expansion of the soils.

    加筋土荷载膨胀试验,取三种不同加筋试样进行试验求膨胀率。

    youdao

  • The concrete realization of the logic module , configurable file downloading module and device drivers module which load FPGA reflection are mainly introduced. The result of the system is also tested.

    主要介绍了逻辑生成模块配置文件下载模块FPGA映像装载设备驱动模块具体实现系统的运行结果给出了测试。

    youdao

  • The concrete realization of the logic module , configurable file downloading module and device drivers module which load FPGA reflection are mainly introduced. The result of the system is also tested.

    主要介绍了逻辑生成模块配置文件下载模块FPGA映像装载设备驱动模块具体实现系统的运行结果给出了测试。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定