• Now you will see the Test panel, as shown in Figure 11.

    现在可以看到测试面板如图11所示。

    youdao

  • I assembled my test panel again, to confirm or deny my initial impressions.

    找来测试组成员验证第一印象

    youdao

  • Above mentioned results are worked out on below test panel, in an ordinary lab environment.

    上述结果基于以下测试板材实验室环境获得的。

    youdao

  • The IVI-C and IVI-COM Driver is implemented based on IVI specification. And a test panel program is developed.

    以及根据IVI规范分别开发IVI-CIVI-COM驱动器,并且开发了一个简易的示例软面板采集程序

    youdao

  • The saliva test panel has the advantages of simple operation, less required saliva amount and high diagnose accordance rate.

    所述唾液操作简单,使用唾液量少诊断率

    youdao

  • The article studied the drive system primarily and discussed the design and the implementation methods of the system which is composed of linear motion device and resolution test panel detailedly.

    文中系统的总体设计方案实现方法进行详细的论述,该系统主要直线运动装置分辨率构成。

    youdao

  • On page level we can test if every panel is visible and if the communication between them is handled properly.

    如果每个面板可见而且它们之间通讯处理妥当我们就可以页面级别进行测试

    youdao

  • This example shows a test case added for the navigation panel referenced in the requirement added previously (see Figure 8).

    这个示例显示以前添加需求中,导航模板参考添加的测试用例(8)。

    youdao

  • To see all of this information, click on the Matched panel of the Test Rule section and scroll down using the down-arrow key.

    为了看到所有这些信息单击TestRule部分Matched面板使用向下箭头键向下滚动

    youdao

  • Click Test a Login to display a panel similar to Figure 9.

    单击testaLogin显示9所示类似面板

    youdao

  • Click Test a Login to display the panel shown in Figure 9.

    单击testaLogin显示如图9中所示面板

    youdao

  • All the queues that belong to MYQM are displayed on the right hand panel. Right-click Q.IN and select Put Test message.

    属于MYQM所有队列显示右边面板中。

    youdao

  • To test the new hidden navigation bar, you have to enable the feature from the about: flags panel and then toggle it from the TAB context menu.

    测试这个隐藏导航aboutflags面板里启动这一特性标签环境菜单里进行切换

    youdao

  • The pop-up and related information panel in the Test Execution Record list.

    TestExecutionRecord列表中的弹出相关信息控制板

    youdao

  • You can use the onload event handler to test that specific fields (on which the update panel depends) are populated.

    可以使用onload事件处理程序测试特定字段更新面板所依赖的字段)是否已填充。

    youdao

  • Expand getProductsByCategory in the left panel and double click Request 1, you can see the pre-constructed SOAP request that can be sent as a test. (Figure 15)

    面板展开getProductsByCategory双击Request1看到可以作为一个测试发送的预构建SOAP请求

    youdao

  • After test execution, in the event of a problem, select Defects from the left panel to choose either of these options.

    测试执行之后,问题事件左边窗格之中选择Defects选择其中一个选项

    youdao

  • Dedicated view for tests, with details panel for viewing a selected test output.

    测试专用视图可以显示选定测试输出

    youdao

  • To define and use a test client, right-click on the input node, MQInput or HTTPInput, and select test. An Events Panel opens.

    定义使用测试客户端可以右键单击输入节点MQInput或者HTTPInput选择test

    youdao

  • "The English test score shouldn't be counted into the total points of gaokao but should be considered as just a reference," Yu said after a panel discussion on Monday.

    周一小组讨论会后,俞敏洪表示英语考试分数应该计入高考总分当中应该仅仅作为一个参考

    youdao

  • Good experience on panel preparation, property test.

    色板准备性质测试方面经验丰富

    youdao

  • Experienced at control panel building and testing, can build and test the panel according to Electrical Diagram.

    控制面板经验测试可以建造建筑物测试小组根据图。

    youdao

  • Panel plasma actuator and cylinder plasma actuator have been test to produce panel glow plasma and cylinder glow plasma.

    试验平板圆柱等离子反应器产生了平板和圆柱辉光等离子体。

    youdao

  • Methods Recipient's panel reactive antibody (PRA) was detected by using micro complement dependent lymphocytotoxicity test with Lambda cell tray.

    方法应用莱姆德细胞通过补体依赖微量细胞毒性试验检测受者的群体反应抗体PRA) ;

    youdao

  • A dimmer control knob is provided on the right side of the front panel which also activates the lamp test.

    面板右侧提供了一个控制旋扭,由此可以激发灯泡试验

    youdao

  • Based on standard test method ASTM C1550 for fibre reinforced concrete (FRC), a modified round panel test method for the material performance of FRC by measuring crack opening width is presented.

    美国材料试验协会标准ASTMC1550试验方法基础上,提出一种改进基于裂缝度量测技术纤维混凝土(FRC)材料静定圆板试验方法。

    youdao

  • This paper proposes a robust method to respectively test for the existence of individual effects and time effects in panel data models.

    本文提出了一个稳健方法分别检验面板数据模型随机个体效应随机时间效应的存在性。

    youdao

  • This paper proposes a robust method to respectively test for the existence of individual effects and time effects in panel data models.

    本文提出了一个稳健方法分别检验面板数据模型随机个体效应随机时间效应的存在性。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定