• The space ship was originally scheduled for lift-off on June 13, but was first postponed because of a leak associated with the hydrogen venting system outside the shuttle's external fuel tank.

    奋进号"原定6月13日发射外部燃料箱某处燃料泄漏而推迟发射时间。

    youdao

  • The space ship was originally scheduled for lift-off on June 13, but was first postponed because of a leak associated with the hydrogen venting system outside the shuttle's external fuel tank.

    奋进号"原定6月13日发射外部燃料箱某处燃料泄漏而推迟发射时间。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定