• Spoke type, suitable for electronic truck scales, hopper scales, warehouse scale, tank scale, axle wheel scale other electronic weighing or force measuring fields.

    结构,适用电子汽车衡料斗仓储灌体秤、轴重各类电子称重设备场合。

    youdao

  • You sit on a scale inside a tank of water and blow out as much air as you can.

    坐在里面规模水箱熄你可以尽可能多的空气

    youdao

  • The calculation formulas of leachate treatment scale and volume of regulating tank were conducted based on the calculation formula of leachate production.

    根据液产生量计算公式推导出渗沥液处理规模、渗沥液调节容积计算公式

    youdao

  • The physical condition, project scale and general layout for Weihai Petroleum Wharf and Tank Farm Project are introduced in the paper.

    介绍威海石油码头罐区工程自然条件规模和平面布置特点。

    youdao

  • As scale up is desired, the most straightforward approach is to move to a larger batch reactor such as a large VAT or tank.

    要求放大反应器时,大多直截了当途径较大间歇反应器一个较大大桶罐。

    youdao

  • Acid storage tank should also be clustered nearby to minimize sludge and scale formation in long lines.

    应该集中于厂房附近尽量减少管线中沉积污泥

    youdao

  • The upper section of the water tank is also provided with a plurality of interlaced water eliminators, and a water level display part with scale is arranged on the water tank.

    水箱设有若干交错板,所述水箱设有刻度水位显示

    youdao

  • It is composed of the circulating water loop in constant temperature, surge tank, solenoid valves, flow regulating valve, electronic scale and control units.

    整个系统包括恒温循环水回路稳压电磁流量调节阀电子秤控制单元等组成部分。

    youdao

  • Our special knowhow ------ automatic scale removing system of wash tank, rinsing heater, spray arms and all connections.

    专有技术——全系统自动除垢系统:主漂洗加热器所有的联通系统。

    youdao

  • Introduces the design method for bottom structure of large scale phosphoric acid storage tank based engineering practice.

    通过工程实践介绍大型磷酸贮罐底部结构设计方法

    youdao

  • Engineering practices show that lining hanging concrete in time is an important technique to make sure of the construction safety of large-scale surge tank project at complex geologic condition.

    工程实践表明跟进衬砌悬挂混凝土保证复杂地质条件下大型竖井工程施工安全重要技术措施。

    youdao

  • Also in the material promotion transporting, the elevator installment, the billboard installment, the ships builds suitably, large-scale project and so on shell of tank, bridge, dam, chimney works.

    可适用物料提升搬运电梯安装广告牌安装,船舶修造大型罐体桥梁水坝烟囱工程作业

    youdao

  • This paper discusses the breakdown voltage of MMO (mixed metal oxide) net anode and oxygen depolarization for the large-scale storage tank.

    探讨大型储罐罐底m MO网状阳极击穿电压氧气去极化问题

    youdao

  • This test introduce one kind of electronic truck scale whose scale body structure is using steel plate to make the cold bending tank instead of section.

    本文介绍钢板制成替代型钢制作成秤结构电子汽车衡。

    youdao

  • Pilot-scale test was conducted on the secondary micro-flocculation of water from sedimentation tank for improvement of filtration efficiency.

    改善过滤效果开展二次凝过滤中试研究。

    youdao

  • The graduated scale to be provided for circulating lube oil tank.

    循环光滑油柜内应有刻度尺。

    youdao

  • The first tank in Tamiya's new 1:48 range is the infamous Tiger I, but does this small scale convey the massive bulk of this machine?

    第一一时48分范围臭名昭著i这种小规模转达大规模大量台机器?

    youdao

  • If the construction unit has no suitable compressor and corresponding air storage tank, it is better to adopt large-scale compressor and air storage tank of the production plant for sweeping.

    如果施工单位没有合适压缩机相应的储罐利用生产装置大型压缩机储气罐

    youdao

  • It is essential to control assembly and welding deformations for large scale spheral tank with thin wall in order to guarantee spheral tank construction quality.

    大型薄壁球罐组装焊接变形控制保证球罐施工质量的关键,文章球罐半成品、球罐组装焊接工艺三方面介绍了控制球罐组装及焊接变形的措施。

    youdao

  • Project scale and contents: The investment will be used for the construction of wastewater concentration tanks such as ageing oil tank, water tank (three) & gas resource unit.

    项目建设规模建筑、集水池座)、气源装置污水浓缩

    youdao

  • A foreign company has put foward a foundation plan of the large scale oil tank.

    国外某公司出来用桩基并穿透玄武岩层方案

    youdao

  • The first Dorr-Oliver single-tank reactor installation was based on a small-scale pilot-plant study done in 1959.

    第一多尔-奥利佛单槽反应器是以1959年完成小型试验基础的。

    youdao

  • The first Dorr-Oliver single-tank reactor installation was based on a small-scale pilot-plant study done in 1959.

    第一多尔-奥利佛单槽反应器是以1959年完成小型试验基础的。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定