• Older phones were rather inelegant in their charging behavior; usually filling the battery to capacity and then switching to a trickle current to maintain the highest charge possible.

    的手机充电相当粗放,通常电池充满后,充电器切换涓流电流维持最高的电量。

    youdao

  • Each eight-hour battery charge allows for two-to-three days of switching between focus Settings.

    每次充电8小时可以转换调焦设置两到三

    youdao

  • For example, you can receive a no-charge, detailed financial analysis of the business case for switching from Oracle and a no-charge, customized technical evaluation and conversion plan.

    例如可以收到关于Oracle转换免费的、详尽业务案例财务分析以及一份免费的、量身定制技术评估和转换计划。

    youdao

  • Our work mainly focus on the improvements of reverse recovery charge and gate charge which impact much on high speed switching and high efficiency performance of a VDMOSFET.

    项目主要针对影响器件开关速率高效性能反向恢复电荷电荷进行优化和改进。

    youdao

  • This article takes gate charge characteristics into account and then introduces some methods for calculating output performance of drivers used for switching IGBTs.

    本文就利用栅极电荷特性考虑介绍一些计算用于开关igbt的驱动器输出性能方法

    youdao

  • In this paper, the switching process of power MOSFET is introduced based on its gate-charge characteristics.

    本文介绍了基于功率MOSFET栅极电荷特性开关过程

    youdao

  • By charging at a high current until the temperature reaches a certain point, and then switching to a lower current until the charge is complete, we can get around this limitation.

    收费电流直到温度达到一点然后切换低的电流,直到收费完整的,我们可以得到解决限制。

    youdao

  • A novel passive soft-switching technology equipped with a charge pump regeneration (CPR) network is presented.

    由此提出加入电荷能量再生(CPR)网络无源开关新技术

    youdao

  • In the thesis, I choose P89V51RD2 microprocessor to be in charge of the intelligent control algorithms, data acquisition, inverter control signal output, switching input and output.

    本文采用P 89 V 51rd2单片机作为系统微处理器,负责进行智能控制算法运算数据采集变频器控制信号输出开关量输入输出等。

    youdao

  • The switching-on operation of grounding switch can be done only when the trolley is located at the testing position to prevent switching on the grounding switch with charge.

    手车只有实验位置接地开关才能进行合闸操作防止带电合隔离开关。

    youdao

  • The switching-on operation of grounding switch can be done only when the trolley is located at the testing position to prevent switching on the grounding switch with charge.

    手车只有实验位置接地开关才能进行合闸操作防止带电合隔离开关。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定