• The stayed cable is one of the main stress components.

    斜拉斜拉桥主要受力构件之一

    youdao

  • Measurement of super long stayed cable tension using vibration method is investigated.

    研究超长斜拉索张力振动测试方法

    youdao

  • Cable-stayed bridge and stayed cable are obviously geometrically nonlinear structures.

    斜拉桥斜拉几何非线性明显的结构。

    youdao

  • Stayed cable is very vulnerable to vibration as it is with low rigidity, low damping ratio and light weight.

    由于斜拉刚度阻尼低、质量轻,极易发生振动

    youdao

  • And damage situation of cable-stayed cable is simulated by using RBF network based on finite element model in ANSYS.

    基于ANSYS有限元模型采用RBF网络模拟了斜拉损伤情况

    youdao

  • The results show that using prestressed reinforcing rebar in stayed cable anchorage is reliable, simple and durable.

    结果表明采用预应力钢筋作为斜拉锚固的方式具有锚固可靠、操作简便、耐久性好的特点。

    youdao

  • Orientation method for cable-stayed cable damage and the degree of cable-stayed cable damage based on a model bridge is probed.

    模型背景,探讨了斜拉损伤定位以及损伤程度确定方法

    youdao

  • The complicated structure incorporates a reinforced concrete structure and a spatial steel structure with a stayed cable structure.

    各楼层的梁板柱(包括悬挂斜拉索的立柱)钢筋混凝土结构

    youdao

  • Technic improvements in process of stayed cable installation efficiently protect PE cable, and enhance work efficiency and security.

    斜拉安装工艺改进后,有效地保护了斜拉索层,提高工作效率安全性。

    youdao

  • Three methods often used in analyzing stayed cable are analytic method, equivalent two force members method and finite element method.

    斜拉索静力分析常用方法有:解析有限元法。

    youdao

  • The research on the large-amplitude vibration suppression of stayed cable under wind excited by controlling support axial motion was carried out in this paper.

    主要研究通过支座轴向运动进行控制以减小风荷载作用振动

    youdao

  • A method of two cable-nip traction is first applied when large tonnage cables are installed, all these decrease draught force of leading chain, and avoid surging for stayed cable efficiently.

    上安装吨位斜拉首次采用道索夹牵引方法减小引力有效避免了斜拉索的滑脱。

    youdao

  • Nonlinear finite element program of stayed cable based on the elastic catenary element is programmed. The analytic analysis and finite element analysis of different stayed cables are compared.

    编制基于弹性链线单元斜拉非线性有限元分析程序,比较了斜拉索的悬链线解析解、抛物线解析解基于弹性悬链线单元的有限元解的计算结果。

    youdao

  • It is big, though, with an 800-meter-long-main span that's the largest for a cable-stayed bridge in the nation, and the fifth largest globally.

    这座800大桥该国最长,世界第五长的斜拉索桥

    youdao

  • Building a bridge in the Yangtze River meant breaking another record-at 120 meters, the Sutong has the deepest foundation of any cable-stayed bridge.

    扬子江建造桥梁同时也意味着打破了另一项记录:苏通大桥拥有超过任何斜张桥120桥基

    youdao

  • Background: This massive structure, which mixes cable-stayed spans and typical highway bridge elements, opened in 2008 after nearly 10 years of planning.

    背景这个庞大建筑物融合了斜拉桥桥墩典型公路桥元素,筹划了接近10之久,2008年开通

    youdao

  • It took immense audacity to build a cable-stayed road-bridge spanning the valley of the river Tarn, near Millau, southern France.

    建造这样横跨法国南部米约附近塔恩河谷巨大斜拉桥需要惊人的勇气

    youdao

  • The Puente de la Mujer, like the Sundial Bridge, is a cantilever spar cable-stayed design.

    日晷一样,女人桥采用的也是斜拉桥设计方案。

    youdao

  • The height of the poles is 100 m yet. Soon it will be 320 m. And it will become the world's biggest cable-stayed bridge.

    目前桥两端长度达100很快达到320米,成为世界上最大斜拉桥

    youdao

  • To construct the 1, 060-foot-long arch, they cast 24 feet of concrete at a time, while a separate, temporary cable-stayed bridge held up the unfinished ends until the gap was closed this year.

    为了建造1060英尺长的拱结构他们每次要浇铸24英尺长的混凝土块,与同时,缆绳牵引的桥段两端会在明年会合人。

    youdao

  • Even more visible, though, is the Sutong Bridge, which at 1088 meters (3570 feet) is the world's longest cable-stayed bridge, and the first whose main span exceeds 1000 meters.

    尽管如此更加夺人目光的1088长(苏通大桥全长32.4公里——译注)的苏通长江大桥,世界最长的斜张桥而且也是第一座主跨部分超过1000米的大桥。

    youdao

  • Some people only stayed in one of the restaurants near the cable car station, but we wanted also to do some physical activity.

    有些只想缆车附近一家餐馆里,我们小俩口则体能运动

    youdao

  • Harbin sifangtai bridge is a cable-stayed bridge whose girder is composed by steel i-beam above and concrete deck slab below.

    作为叠合梁斜拉桥,四方台大桥主梁下部的工字钢上部的混凝土行车道板组合而成。

    youdao

  • Based on the cable-stayed bridge using method of cantilever, the paper establishes the optimization model of construction phase with multi-objective and multi-constraint and gives the example.

    采用目标、多约束优化方法悬臂施工主梁的斜拉桥为例,建立了施工阶段的优化模型给出算例。

    youdao

  • Possibility and efficiency in the application of this method to large finite element analysis are illustrated by an example of the stress analysis for a section of a cable stayed bridge.

    斜拉桥桥段应力分析说明大型有限元分析中采用分阶段计算方法可能性有效性

    youdao

  • One of the most noticeable structrual differences between the cable-stayed bridge and the truss and girder types lies in the field of flexibility .

    斜拉桥与桁架梁式类型之间,在结构上一个显著不同之处,在于柔度方面。

    youdao

  • The special architectural form leads to many difficulties in structural design, in which cable-stayed structure is used in railway station for the first time.

    由于第一火车站站房中使用斜拉结构,其奇特的建筑造型,给结构设计带来很多困难

    youdao

  • If you look to the east, you can see the Yangpu bridge, which is the longest cable-stayed suspension bridge in China.

    大家如果向东看到杨浦大桥中国最长悬索桥

    youdao

  • If you look to the east, you can see the Yangpu bridge, which is the longest cable-stayed suspension bridge in China.

    大家如果向东看到杨浦大桥中国最长悬索桥

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定