• In hot mill production the slabs have to be heated to a certain degree of temperature, so that the slabs would be more plastic and easier to be rolled.

    轧钢厂热轧生产中,必须将要轧制板坯加热一定温度使它具有一定可塑性才能轧制

    youdao

  • In order to investigate the bending behavior of the composite slabs with closed profiled sheeting and concrete, experiments are conducted on 4 simply supported composite slabs.

    为了得到闭口型压型钢板-混凝土组合受弯性能进行4闭口型压型钢板组合板的试验

    youdao

  • In 1999, the cross cracks occurred frequently in cc slabs cast in our plant, and brought a serious influence to slabs quality.

    1999年我厂板坯连铸生产频繁出现裂纹严重影响质量

    youdao

  • This article introduced the process to improve the CC slabs quality by controlling each important parameter in CC process of the research and the development of Hull Structural ship slabs.

    本文介绍了首钢在开发高强船板过程中,通过连铸工艺各个重要参数控制,改进高强船板铸坯外部质量的情况。

    youdao

  • The result suggests that the cavity beneath cement concrete pavement slabs and the vehicle overloading are the important factors in incipient fracture of cement concrete pavement slabs.

    结果表明水泥混凝土路面板下脱空超载车辆重载车辆造成水泥混凝土路面早期断裂重要因素

    youdao

  • Measures are taken to decrease non - order slabs in aspects of the resource of non-order slabs, operation process and quality management. The amount of non-order slab decreased 50%.

    减少委托板坯,从无委托板坯产生源头、操作过程质量管理方面采取了措施,使无委托板坯下降50%以上。

    youdao

  • To prevent defects of continuous cast slabs, it must be considered to control the stresses and strains in slabs in casting machine design and operation.

    防止板坯连铸中的缺陷设计生产必须考虑控制应力应变

    youdao

  • The defects on pinhole bubble formed in slabs result from badness deoxidization, and the defects on large volume bubbles formed in slabs result from the high flux of argon during casting.

    铸坯内产生针孔气泡缺陷原因是钢液脱氧不良,产生体积气泡缺陷的原因是铸机浇注过程氩气流量过高

    youdao

  • The Test result showed that shear capacity is higher for the thicker composite slabs, the smaller shear span, the more distributed reinforcing bar in the composite slabs.

    试验结果表明组合厚、跨越、剪力横向钢筋越多,组合板纵向受剪承载力越高

    youdao

  • The Test result showed that shear capacity is higher for the thicker composite slabs, the smaller shear span, the more distributed reinforcing bar in the composite slabs.

    试验结果表明组合厚、跨越、剪力横向钢筋越多,组合板纵向受剪承载力越高

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定