• Sliding occurred in the slope side of spillway on the right bank after the spillway was excavated.

    大水沟水库溢洪道开挖,右岸边坡发生滑动失稳。

    youdao

  • The application of carbon fiber textile is explained by an engineering example that the cracked concrete side pier of a spillway dam is strengthened with this material.

    水库溢流坝局部开裂补强加固为介绍采用条状的碳纤维布增强闸边墩混凝土的新技术。

    youdao

  • Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.

    万安水电站二期主体工程溢流坝6 ~15坝段左岸溢流坝5坝段部分采用碾压混凝土筑坝技术。

    youdao

  • Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.

    万安水电站二期主体工程溢流坝6 ~15坝段左岸溢流坝5坝段部分采用碾压混凝土筑坝技术。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定