• The hydrology and water quality of runoff events were measured on gauging station and the runoff plots in the watershed and the rules of runoff, sediment, nitrogen and phosphorus load were analyzed.

    流域出口建立卡口进行基于过程汛期水文水质全面监测,同时流域内设立径流小区,分析径流事件径流量沉积物量负荷规律

    youdao

  • This paper uses the sediment rating curve to simulate the sediment flux on the basis of on-site measured SSC and published values from the Datong Hydrological Gauging Station for the past 40 years.

    依据关系模型,对过去近40年来大通水文站提供泥沙实测值公布做了计算,并此基础上作了修正。

    youdao

  • These two methods were used at Tongguan hydrometric station to test flow and sediment forecasting and the results computed have shown efficiently improved accuracy of prediction.

    两种方法对黄河潼关水文站序列进行了预测,经计算表明改进的时间序列方法有效地提高了预测精度

    youdao

  • According to the observed runoff and sediment data of Lijin Hydrometric Station, the paper analyzes the characteristics of runoff and sediment variations of the Yellow River mouth since 1950.

    根据利津水文站实测水资料分析了1950年以来黄河口水沙的变化特征

    youdao

  • The flow regime, sediment deposition and the loss of head of two head tanks of the sewage pumping station with different dimensions are studied by using a hydraulic model test method.

    采用水力模拟方法两个不同结构尺寸污水泵站高位井水流泥沙淤积水头损失进行模型试验。

    youdao

  • Based on the data from Datong gauging station of Yangtze River, the grain-size characteristics of suspended sediment has been studied by using regression analysis.

    大通为例,回归分析方法研究了长江入海移质泥沙的粒度特征

    youdao

  • For the hydropower station built on heavily sediment-laden river, it is always a especially concerned problem to desilt at the water intake of hydropower station.

    河流电站进水口的取水排沙历来一个倍受关注的问题

    youdao

  • The paper analyzed change characteristic of sediment flow of the river course in every age using Sikeshu river Jilede hydrologic station material.

    基于四棵树吉勒德水文站资料分析河道输沙量年代变化特征

    youdao

  • The right bank spillway tunnel at Lubuge hydropower station is the most important passageway of water discharging and sediment flushing.

    鲁布水电站右岸泄洪洞承担着鲁布革大坝泄洪、排沙、放空水库任务,重要的泄洪、排沙通道

    youdao

  • In order to ensure the excavation of sediment discharge bottom outlet at right side and foundation of the power house dam section, the blasting method was used in Jinghong power station.

    景洪水电站主厂房右侧紧邻右冲底孔,右冲沙底孔作为二期纵向围堰组成部分,在主厂房开挖前已经形成。

    youdao

  • In order to ensure the excavation of sediment discharge bottom outlet at right side and foundation of the power house dam section, the blasting method was used in Jinghong power station.

    景洪水电站主厂房右侧紧邻右冲底孔,右冲沙底孔作为二期纵向围堰组成部分,在主厂房开挖前已经形成。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定