The hydrology and water quality of runoff events were measured on gauging station and the runoff plots in the watershed and the rules of runoff, sediment, nitrogen and phosphorus load were analyzed.
在流域出口建立卡口站,进行基于过程的汛期水文水质全面监测,同时在流域内设立径流小区,分析了径流事件中径流量、沉积物量、氮和磷负荷规律。
This paper uses the sediment rating curve to simulate the sediment flux on the basis of on-site measured SSC and published values from the Datong Hydrological Gauging Station for the past 40 years.
依据水沙关系模型,对过去近40年来大通水文站提供的泥沙实测值和公布值做了计算,并在此基础上作了修正。
These two methods were used at Tongguan hydrometric station to test flow and sediment forecasting and the results computed have shown efficiently improved accuracy of prediction.
用这两种方法对黄河潼关水文站水沙序列进行了预测,经计算表明,改进的时间序列方法有效地提高了预测精度。
According to the observed runoff and sediment data of Lijin Hydrometric Station, the paper analyzes the characteristics of runoff and sediment variations of the Yellow River mouth since 1950.
根据利津水文站的实测水沙资料,分析了1950年以来黄河口水沙的变化特征。
The flow regime, sediment deposition and the loss of head of two head tanks of the sewage pumping station with different dimensions are studied by using a hydraulic model test method.
采用水力模拟的方法对两个不同结构尺寸的污水泵站高位井的水流流态、泥沙淤积及水头损失等进行了模型试验。
Based on the data from Datong gauging station of Yangtze River, the grain-size characteristics of suspended sediment has been studied by using regression analysis.
以大通站为例,用回归分析的方法研究了长江入海悬移质泥沙的粒度特征。
For the hydropower station built on heavily sediment-laden river, it is always a especially concerned problem to desilt at the water intake of hydropower station.
多沙河流上的电站进水口的取水排沙历来是一个倍受关注的问题。
The paper analyzed change characteristic of sediment flow of the river course in every age using Sikeshu river Jilede hydrologic station material.
基于四棵树河吉勒德水文站资料,分析了河道输沙量各年代的变化特征。
The right bank spillway tunnel at Lubuge hydropower station is the most important passageway of water discharging and sediment flushing.
鲁布革水电站右岸泄洪洞承担着鲁布革大坝泄洪、排沙、放空水库的任务,是最重要的泄洪、排沙通道。
In order to ensure the excavation of sediment discharge bottom outlet at right side and foundation of the power house dam section, the blasting method was used in Jinghong power station.
景洪水电站主厂房右侧紧邻右冲沙底孔,右冲沙底孔作为二期纵向围堰的组成部分,在主厂房开挖前已经形成。
In order to ensure the excavation of sediment discharge bottom outlet at right side and foundation of the power house dam section, the blasting method was used in Jinghong power station.
景洪水电站主厂房右侧紧邻右冲沙底孔,右冲沙底孔作为二期纵向围堰的组成部分,在主厂房开挖前已经形成。
应用推荐