For that reason, it's easier if the detailed activities in your WBS are action oriented - just as activities in your schedule would be.
由于这个原因,如果你的详细活动是以行动为导向的话一切都要轻松些,正如日程表上的活动那般。
The detailed activities on your WBS (the ones that are not broken down further) are ultimately moved to your schedule.
WBS上的详细活动(无法继续分解的活动)最终要放到你的日程表上面去。
Drafting a work breakdown structure (WBS) as the basis for a project schedule.
草拟以项目计划为基础的工作故障结构(WBS)。
Integration of the WBS in the Project schedule.
在项目日程中整合wbs。
The WBS is not the same as the final schedule (which requires sequencing, resources, estimated effort, estimated duration, etc.).
WBS跟最终的日程安排(需要序列化、资源、效果评估、时限估算等)并非完全一致。
A work breakdown structure (WBS) is the best way to understand the detailed work of a project when you have to build a schedule from scratch.
当你需要从草稿中拟定出日程表时,工作分解结构(WBS)是理解项目工作细节的最好方式。
The elements in the WBS can now have time applied, and they can affect the schedule.
WBS 中的元素现在能够应用,并且它们能够影响该列表。
Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.
同时,对项目的计划与进度控制过程中所使用的具体方法进行了研究,诸如swot分析、SWART原则、WBS分解等。
The main purpose of the chart was for us to agree on schedule and milestones and to set up a hierarchy of work breakdown structure (WBS) items that we could track, estimate, and execute against.
这个图表对我们的主要目的是对时间进对和里程碑达成一致,并且建立工作分解结构(work breakdown structure,WBS)的层次图,工作分解结构中的每一项我们都可以跟踪、估计和执行。
Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc. in this paper.
同时,对项目的计划与进度控制过程中所使用的具体方法进行了研究,诸如swot分析、SWART原则、WBS分解等。
It should also include estimates and a project schedule, including any revisions that were made during the review meetings. Chapter 3 contains a repeatable process for generating a WBS and estimates.
它还应该包括估算和项目进度计划,以及评审会议上做出的任何修改。第三章包括一个用于产生WBS和估算的课重复过程。
It should also include estimates and a project schedule, including any revisions that were made during the review meetings. Chapter 3 contains a repeatable process for generating a WBS and estimates.
它还应该包括估算和项目进度计划,以及评审会议上做出的任何修改。第三章包括一个用于产生WBS和估算的课重复过程。