Construction phase: Manage schedule risk.
构建(Construction)阶段:管理进度风险。
RUP's Construction phase is directed at managing schedule risk.
RUP的构建阶段瞄准进度风险的管理。
Or if the existing service is leveraged, it will increase schedule risk.
或者利用现有的服务会增加进度风险。
Case study shows that the resource reallocation model considering schedule risk factors is reasonable.
结果表明,考虑进度风险因素的优化模型是科学合理的。
Therefore, it is of very importance to perform schedule risk analysis before the implementation of R&D project.
因此,在研发项目实施之前开展进度风险分析十分必要。
The schedule risk is an important risk during new equipment development, which correlates with plan technique and other factors.
进度风险是新装备研制面临的重要风险之一,它与计划、技术等因素密切相关。
Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.
建立了研发项目多执行模式随机资源约束项目调度问题模型。
During the control decision process of the mishap risk of the product, other relevant kinds of risks should be considered, such as financial risk, schedule risk.
进行产品事故风险控制决策,应当考虑产品事故风险与其他有关风险之间的接口关系,例如资金风险、进度风险等。
Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.
运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。
Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.
在上述研究基础上,制定了具体的风险应对工程措施和非工程措施,有效控制了DS水闸枢纽工程进度风险。
Project management: Cost, schedule, risk, staffing, and so forth.
项目管理:成本、时间表、风险、人员分配等等。
Build a risk management plan that includes plans for dealing with risks related to technical issues, schedule, and cost.
应构建风险管理计划,包括处理与技术问题、日程表和成本相关风险的计划。
If issues arise that might jeopardize the schedule, project management can proactively take steps to mitigate risk at every level.
如果产生了可能能够危害到进度的问题,项目管理者可以预先进行在各个级别采取减小风险的措施。
By the impact of the risk — the deviations of schedule, effort, or cost from plan if the risk materializes.
按照风险的影响——如果风险突然出现,与计划在进度、工作量或成本上的偏离。
Facilitating communication regarding the project scope, schedule, risk, performance, cost etc with the stakeholders throughout the project life cycle.
便于在整个项目生命周期中,对项目范围,进度,风险,绩效,成本等问题与项目干系人沟通。
Moreover, you can leverage the invaluable engineering information captured in the DoDAF products to reduce risk to cost and schedule during systems development.
此外,您可以利用在DoDAF产品中获得的非常宝贵的工程信息来减少系统开发中成本和进度安排的风险。
A key meeting I conduct on all of my projects is an issue, risk, and detailed project schedule review meeting.
我曾针对自己的所有项目召开过一次很关键的会议,是关于问题、风险、项目进程明细表的回顾会议。
An integrated software development platform and consistent, configurable processes and best practices are essential to mitigate risk to cost and schedule across these large projects.
一个集成的软件开发平台和一致的,结构化的过程以及良好的实践对减小风险和成本,确定大型项目的时间进度都是至关重要的。
However, to minimize your risk of injury, resist the urge to run more miles than your schedule calls for or at a pace that is much faster than your present level of conditioning.
冉冉为了降低你受伤的危险,要抵抗跑超过训练计划距离的诱惑,或者用远远超过你个人水平的配速来跑的诱惑。
Prepare project management for some project, control project schedule, control project cost and down project risk.
参与部分项目的项目管理工作,把控项目进度,控制项目成本,降低项目风险;
Project cost and schedule cannot be finalized without completing risk management.
没有完成风险管理之前,项目成本和进度无法最终确定。
For example, a proposed schedule change will often affect cost, risk, quality, and staffing.
例如,一个被提议的进度变更常会影响成本,风险,质量和人员构成。
The construction schedule is only a plan, which always has risk.
施工进度计划只是一个计划,总存在风险。
Performance reports provide information on the project's performance with regard to scope, schedule, cost, resources, quality, and risk.
绩效报告提供了有关项目在范围、进度、费用、资源、质量与风险方面绩效的信息。
At that time, the team might recognize that the cost and schedule targets are overly aggressive, thus involving considerably more risk than previously understood.
这时候,项目团队可能才意识到费用和进度目标过于乐观,由此会带来比以前的想像大得多的风险。
The results show that the project management objective system with quality, schedule, cost, safety, environmental protection and risk can manage projects scientifically and comprehensively.
结果表明:由质量、进度、成本、安全、环保、风险六大管理目标构成的目标体系是科学、全面管理工程项目的重要保证。
The review activity in the process of product development will play a great role to ensure the project schedule, product quality and reduce the risk of development.
型号研制中的评审活动对于保证工程进度和质量以及降低研制风险起着至关重要的作用。
The risk register includes information such as the risk owner, cause, effect, status, probability, impact of the risk on the project cost, schedule and customer.
风险登记簿包含的信息有风险责任人、成因、效应、状态、概率、风险对项目费用、进度和客户的影响等。
To reduce the risk of project implementation failure brought by unsuitable project schedule, temporal constraint network was applied to the research of project scheduling.
为了降低由进度安排不当导致项目实施失败的风险,将时间约束网络应用到项目实施进度计划研究中。
To reduce the risk of project implementation failure brought by unsuitable project schedule, temporal constraint network was applied to the research of project scheduling.
为了降低由进度安排不当导致项目实施失败的风险,将时间约束网络应用到项目实施进度计划研究中。
应用推荐