Fundamentally, the initial cost and schedule estimates are frequently way off.
从根本上说,最初的对成本和工期的评估往往都会失效。
Stakeholder concurrence on scope, requirements, constraints, and schedule estimates.
涉众在规模、需求,限制以及进度评估上的合作。
The final Elaboration phase deliverable is a plan (including cost and schedule estimates) for the Construction phase.
最后制定阶段成果是一个计划(包括成本和进度的估计数)的施工阶段。
The estimates could be of any parameter interest: e.g., effort or schedule.
这些估计可以用于所有参数:例如,工作或进度。
We had a clean technical solution, more reliable estimates, and a schedule that (although tight) we felt would get us to the end.
我们有一个清晰的技术方案,更加可靠的估计和我们觉得能够完成的时间计划。
You're really doing the same thing in both cases: documenting tasks, gathering work estimates, and tracking progress with an eye on the schedule.
其实,在这两个过程中,你都做了同样的事情:描述任务、评估工作量、在时间表上跟踪项目进度。
Aside from tagging and traceability, consider adding the different automation, performance, security testing, and Web service testing tasks to your schedule and estimates.
除了标签和追踪性,考虑一下向您的日程表和估计添加不同的自动化,性能,安全性测试以及Web服务测试任务。
Refine schedule and budget estimates based on details of the design model.
基于设计模型的细化时间进行计划和预算的预估。
Develop a sense of who in your life is good at estimating time and who isn't, because you need to be able to compensate for the people who mess up your schedule with poor time estimates.
培养一种感觉。判读出你身边谁善于估计时间,谁不擅长,因为你还必须要能够对那些将你的安排计划打乱,时间估计不准的人们补偿。
These meetings should include reviewing and updating the construction schedule and the cost estimates.
这些会议应当包括回顾和更新施工进度和成本预算。
If the Contract does not include a schedule of payments, the Contractor shall submit non-binding estimates of the payments which he expects to become due during each quarterly period.
如果在合同中没有支付表,则每个季度承包商应就其到期应得的款额向雇主提交一份不具约束力的估价单。
It should also include estimates and a project schedule, including any revisions that were made during the review meetings. Chapter 3 contains a repeatable process for generating a WBS and estimates.
它还应该包括估算和项目进度计划,以及评审会议上做出的任何修改。第三章包括一个用于产生WBS和估算的课重复过程。
Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to (75) progress.
制订进度过程要求对历时估算和资源估算进行评审和修订,从而产生一个经过认可的项目进度作为对项目进展进行追踪的基准。
Procedures for developing solid cost, schedule, and resource estimates.
对成本、进程、资源进行评估的程序。
Procedures for developing solid cost, schedule, and resource estimates.
对成本、进程、资源进行评估的程序。