时间解析;
Prepare for the next two weeks in fantasy hoops with matchup previews, schedule analysis and more, including a downloadable projections cheat sheet.
准备在接下来的两个星期在梦幻篮球的比赛预览、进度分析和预测,包括可下载的预测小抄。
If the estimated schedule is too long, customers and bosses will pressure you to shorten it — not because of flaws in your analysis but simply because they want it to be shorter.
如果你给出的预计开发时间太长,你的客户或老板可能会对你施加压力,希望你缩短开发日程。这不是因为你的分析预测有任何瑕疵,而只是因为他们希望在更短的时间内完成。
Specifically, they focus on preparing data for analysis — the task that usually accounts for 80 percent of the schedule for most data warehouse projects.
将特别关注为分析准备数据——该任务通常占大多数数据仓库项目计划的80%。
It will explore using a visually guided, directory-based (tree-based) editor and steps to create, edit, schedule the emulation, and get analysis reports.
它将探索一个视觉指导的、基于目录的(基于树形结构的)编辑器和步骤来创建、编辑、确定评价时间、并且获得分析报告。
This academic year, as in the last few years, my schedule started out by teaching a course in object-oriented analysis and design (OOAD).
这几年的学术生涯,我教授面向对象分析和设计(OOAD)的课程。
Tools used in this process include critical path method, schedule compression, what-if scenario analysis, resource leveling, and critical chain methods.
在这一步中所用到的工具包括:关键路经法,计划压缩,what-if脚本分析,资源水平,关键链。
Incorporating the multi-tier analysis solution to a single-tier schedule.
在单层时间安排上结合多层分析解决方法。
To run the standard analysis rule set, the development manager USES Build Forge to automate the steps to configure, schedule, and run software analysis.
要运行标准的分析规则集,开发经理要使用BuildForge来自动化配置,配置计划表的步骤,并运行软件分析。
C. Crashing is only a viable alternative if earned value analysis indicates that the project is ahead of schedule and under budget.
如果挣值分析表明项目提前于进度计划,并且低于预算,则赶工是惟一一项可行的选项。
Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.
同时,对项目的计划与进度控制过程中所使用的具体方法进行了研究,诸如swot分析、SWART原则、WBS分解等。
The project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit.
进行了完工概率分析,较好地描述了施工进度计划的不确定性,为施工工期论证分析提供了依据。
Once quoted the CRM will schedule a Gap Analysis audit with the client and assigned Lead Auditor. Gap Analysis audits should be set up as a Special audit job in IQ, and the.
报价以后,客户关系经理就会和客户商议安排一次差异分析审核并指定审核组长。
The probability distribution and risk curve of schedule and cost are obtained by statistic analysis, providing a basis for risk evaluation of engineering projects.
通过统计分析得到进度和费用的模拟概率分布,进而得到进度和费用风险曲线,为评价工程项目的风险提供了依据。
In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key.
工程施工进度风险分析计算是施工进度控制中的重要环节。
The schedule in this pattern emphasized the harmonization of parallel projects based on the whole system, and its developing steps include structure analysis, estimation of time and planning.
该模式的项目进度计划从系统整体出发着重强调并行项目之间的相互协调,其编制步骤可分为项目结构分解、项目活动时间估算及计划编制。
This paper introduces system analysis method, perpendicular analysis method, experimental schedule arrangement and management that adopted in emission experiment of vehicle's ICE.
本文介绍了系统分析法、正交分析法、优化技术、试验计划安排和管理等方法和手段在车用内燃机排放试验中的应用。
Therefore, it is of very importance to perform schedule risk analysis before the implementation of R&D project.
因此,在研发项目实施之前开展进度风险分析十分必要。
For example, a formal work breakdown structure, schedule network, earned value analysis, change control process and so on.
举例来说,一个正式的工作分解结构,进度网络,挣值分析,改变控制过程等。
Support for calibration, measurement system analysis, risk assessment, maintenance schedule, spare parts.
支持工程师进行新设备的校准、系统分析,风险评估,保养计划及零部件清单。
Analysis is conducted on these factors. Taking Lanzhou-Chengdu-Chongqing product Pipeline for example, the influence of schedule variation on the product contamination downstream is discussed.
对这些因素进行了分析,以兰成渝成品油管道为例,探讨了调度计划的变化对下游混油量的影响。
It contains a superb analysis of climbing balance and movement and offers superb guidance to develop your own training schedule.
它包含了登山运动的平衡和高超的分析并具有出色的指导,开发自己的训练计划。
The recognition and analysis methods of schedule deviation.
进度偏差识别与分析方法。
ABSTRACT: This paper introduced the progress control process of initial energization in AP1000 Sanmen Project, and provided the analysis direct at schedule variance appeared.
摘要:介绍ap1000三门项目首次倒送电的整体进度控制过程,并针对现场执行过程中执行计划与基准计划的偏差进行分析。
Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.
运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。
Also presents five methods of schedule monitoring; especially the "s" curve and Earned Value analysis.
此外,对进度检测的五种方法进行了详细的讨论,如“S”曲线比较法、挣值分析法等。
In this paper, optimization of hydropower project construction schedule and control methods of theoretical analysis and application.
本文针对水电工程施工进度的优化及控制方法进行了理论分析与应用研究。
At the same time, through the analysis of the parallel relation among the multiprocessor parallel job, the low bound of the optimal schedule has been provided.
同时,通过对多处理机任务之间的并行关系的分析,得到了一般最优调度的下界。
Abstract: This paper aims to make a comparative analysis of different methods for project schedule performance prediction.
[摘要]对项目进度绩效预测方法进行比较分析。
Abstract: This paper aims to make a comparative analysis of different methods for project schedule performance prediction.
[摘要]对项目进度绩效预测方法进行比较分析。
应用推荐