The construction of roller compacted asphalt concrete core wall and the transition lager and the cons...
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body goo…
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
Roller compacted asphalt concrete core wall is built by spreading hot-mixed asphalt concrete with a certain thickness and then shaping-rolled by vibratory roller.
碾压式沥青混凝土心墙,是将热拌后的沥青混合料按一定的厚度摊铺在铺筑部位上,然后用适当的振动碾碾压成型。
Roller compacted asphalt concrete core wall is built by spreading hot-mixed asphalt concrete with a certain thickness and then shaping-rolled by vibratory roller.
碾压式沥青混凝土心墙,是将热拌后的沥青混合料按一定的厚度摊铺在铺筑部位上,然后用适当的振动碾碾压成型。