• This paper presents a report of the stress analysis of a cylindrical shell, with a reinforced hole, by use of the mixed method in FEM.

    本文提供有限单元混合法对开圆柱进行应力分析报告

    youdao

  • The moving "Y" has a 5 mm hole drilled through it, through which runs the carbon fibre reinforced epoxy connecting rod.

    移动的“Y5毫米钻孔通过,通过运行碳纤维增强环氧树脂连杆

    youdao

  • The sleeve is a hollow cylindrical sleeve; reinforced hoops are respectively arranged on the upper end and lower end of the sleeve; a vertical waist-shaped long hole is arranged on the sleeve.

    所述套筒空心圆柱形,套筒的两端分别设有加强,套筒上设置有纵向的腰形

    youdao

  • The relieved coefficients during the measurement of the residual stresses in the fiber reinforced composites by the hole drilling method were given with conversion of the two coordinate systems.

    针对纤维增强复合材料属性特点,应用坐标系转换原理推导出通测量复合材料残余应力的应力释放系数公式。

    youdao

  • In the construction of retaining wall with steep slope grade, manual hole digging piles are adopted in combination with reverse working for ramming reinforced concrete wall panel.

    高坡土墙施工采用人工挖孔,并结合逆作法钢筋混凝土墙板的方法,具有无需土方大开挖、无需支撑、施工安全和节约基建投资等优点。

    youdao

  • The reinforced insert part has a fastening mechanism that is fixed in the suction passageway and an access hole that is easy for removing the reinforced insert part from the suction passageway.

    加强具有用于通道固定紧固机构用于容易地加强嵌件抽吸通道拆除的拆卸

    youdao

  • The blemish is a familiar and important reinforced concrete to drill a hole to infuse to note a quantity problem.

    桩头缺陷常见严重钢筋混凝土钻孔灌注桩质量问题

    youdao

  • In order to increase the valve barrel strength and service life, the method of hole hydraulic self-reinforced is used.

    为了增加泵头体的强度使用寿命,采用液压增强对内腔进行预应力处理。

    youdao

  • The traditional way of drilling is replaced by pre-plugged in shot hole the reinforced concrete braces when we demolish the reinforced concrete braces at roundation pit by blasting.

    介绍了高层建筑物钢筋混凝土基坑围护系统拆除爆破工程中,采用预先埋设方法取代传统的钻眼法,并对预先埋设法的工艺流程以及施工中一些问题进行了初步研究。

    youdao

  • The traditional way of drilling is replaced by pre-plugged in shot hole the reinforced concrete braces when we demolish the reinforced concrete braces at roundation pit by blasting.

    介绍了高层建筑物钢筋混凝土基坑围护系统拆除爆破工程中,采用预先埋设方法取代传统的钻眼法,并对预先埋设法的工艺流程以及施工中一些问题进行了初步研究。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定