• The reformation scheme of capacity expansion for 50mw turbo-generator set and the operation condition after the reformation have been introduced.

    介绍50MW汽轮发电机组增容改造实施方案运行情况

    youdao

  • Abstract: the reformation scheme of capacity expansion for 50mw turbo-generator set and the operation condition after the reformation have been introduced.

    摘要:介绍50MW汽轮发电机组增容改造实施方案运行情况

    youdao

  • Abstract: the reformation scheme of capacity expansion for 50mw turbo-generator set and the operation condition after the reformation have been introduced.

    摘要:介绍50MW汽轮发电机组增容改造实施方案运行情况

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定