Compared with plate raft, stiffened raft has evident advantages in diminishing nonuniform settlement, improving the internal force distribution of raft and reducing construction cost.
与平板筏基相比,梁板式筏基对于减小不均匀沉降、改善筏板内力分布、降低工程造价方面都有比较明显的优点。
Rational small bridge and culvert investigation, design takes important role in reducing construction cost, easy construction and giving a full play to highway usage performance after completion.
合理的小桥涵勘察、设计,对降低工程造价、方便施工及竣工后充分发挥公路使用效能具有重要作用。
Construction in the river and the beach can also avoid the construction of the cofferdam, reducing the cost of drainage.
施工中还能避免在河道和海滩建筑围堰,减少排水费用。
Limit pressure can provide pipeline design parameters and the guarantee of safely operating, thus saving the construction cost and reducing danger of burst accidents.
管道极限压力的确定能为管道设计提供优化参数和安全运行保障,节约建设成本,降低危险系数。
However, with the fierce competition of construction in the market environment, controlling pile foundation's cost is imperative, especially by reducing overplus capacity.
然而在目前建筑业激烈竞争的市场环境下,控制建筑成本,尤其是通过降低过剩承载力来降低桩基成本势在必行。
This paper introduced the basic features for the design of 2000t standard tanker in Chuanjiang River, and the measures for reducing related construction cost and operation cost.
本文介绍了2000吨川江及三峡库区油船标准船型结构设计的主要特点以及为降低船舶造价和营运成本所采取的措施。
Market requirements have forced construction enterprises to enhance their corporate brand and reducing the cost of two main areas of business.
市场的要求迫使施工企业必须从提升企业品牌和降低企业成本两条主线出发。
Easy to use, good construction property, construction tools available direct water cleaning, reducing the construction cost.
使用方便,施工性能好,施工工具可用水直接清洗,降低施工成本。
It has such advantages as light structure, aesthetic shape, less land requisition and simplified cofferdams and pit drainage, thus shortening the construction period and reducing the cost.
这种结构的优越性是;结构轻巧,造型美观,占地较少,简免施工围堰和基坑排水,从而能缩短工期,降低工程造价。
Effective contract management plays a vital role on improving project quality, reducing project construction cost and time.
搞好合同管理,对提高工程质量、降低工程造价和缩短建设工期有重要的意义和作用。
The proposed design method is meaningful to reducing the construction difficulty, decreasing the construction period, saving the cost and improving the reliability of design.
此设计方法对降低施工难度、缩短工期、节约成本、保证设计的可靠度都具有重要意义。
It is verified by practical cases that by means of the se measures, the efficiency of pre-thickening is improved, and thus reducing the construction and operating cost.
通过具体算例验证,该措施提高了预浓缩效率,降低了工程造价及运行费用。
It is verified by practical cases that by means of the se measures, the efficiency of pre-thickening is improved, and thus reducing the construction and operating cost.
通过具体算例验证,该措施提高了预浓缩效率,降低了工程造价及运行费用。
应用推荐