The reactor power setback logic initiated at 2 percent power while reactor power was being raised from a lower power level in preparation for Heat Transport System (HTS) warm2up.
在反应堆从低功率级开始提升以准备热传输系统(HTS)升温的同时,反应堆功率慢速降逻辑于百分之二功率上启动。
The reactor power setback logic initiated at 2 percent power while reactor power was being raised from a lower power level in preparation for Heat Transport System (HTS) warm2up.
在反应堆从低功率级开始提升以准备热传输系统(HTS)升温的同时,反应堆功率慢速降逻辑于百分之二功率上启动。
应用推荐