碾压混凝土重力坝是一种新的坝型。
Artificial aggregates are used for Jiangya RCC dam.
江垭大坝碾压混凝土采用人工骨料。
Research on the crack control measures of RCC dam in the view of structure.
本文从结构方面进行了碾压混凝土坝防裂措施的研究。
It provides important reference for Longtan high RCC dam design and construction.
为龙滩高碾压混凝土重力坝设计和施工提供了重要的参考依据。
The reinforced concrete face-slab is adopted as impervious body by Long Tan RCC Dam.
龙滩碾压混凝土重力坝采用钢筋混凝土面板作为防渗体。
For the RCC dam of Taolinkou Reservoir, RCC was developed in the conventional concrete.
桃林口水库碾压混凝土坝为“金包银”形式。
The RCC dam of Longtan project is one of the highest dam in the world under construction.
龙滩水电站大坝为目前世界上在建的最高碾压混凝土坝。
The impervious facing is built on the front side of Gaobazhou RCC dam to improve its impermeability.
为提高高坝洲水电站二期RC C坝体的抗渗性,在坝体上游面采用防渗护面技术。
Based on finite element method (FEM), the author compiles the three-dimensional seepage field computation program of RCC dam.
开展碾压混凝土坝渗流场的有限单元法研究工作,编制完成碾压混凝土坝三维渗流场计算程序。
The authors determined that Miyatoko Dam (see Figure 10), a 48m (157ft) high RCC dam was located approximately 13km (8 miles) north of Sendai.
作者肯定地说,高48米的滚筒实压混凝土宫北大坝(见图10)大约在千代以北13公里。
Based on artificial neural network, thermal parameter feedback analysis model of RCC dam during construction period has been established.
基于人工神经网络的方法,建立了碾压混凝土坝施工期热学参数反馈分析模型。
With the extensive application of RCC dam construction technology, the problem of concrete cracking has attracted more and more attention.
随着碾压混凝土筑坝技术在坝工界的广泛应用,其开裂问题越来越引起人们的重视。
In order to analyze the behavior of uplift pressure of RCC dam before and after rehabilitation, the observed data are firstly analyzed qualitatively.
为了分析碾压混凝土坝补强加固前后坝基扬压力变化性态,建立了自适应监控模型,以分析补强加固前后各影响因子对坝基扬压力的影响。
The thermal stress of RCC dam is different from concrete dams, and in order to get correct results, these different characteristics must be considered.
碾压混凝土坝的温度应力有它不同于常规混凝土坝的特点,必须考虑这些特点,才能得到正确的结论。
The engineering experience at abroad compared with RCC dam demonstrated that it has low requirement of foundation, quick speed in construction and low cost.
国外的工程经验表明:与碾压混凝土相比。对地基要求低、施工速度快,总体造价降低;
Therefore, the subject of analysis for temperature stress and research for temperature control measures of RCC dam is very important for dam design and construction.
因此对碾压混凝土坝的温度应力分析和温控防裂措施的研究是设计和施工中的重要课题。
Jinghong hydropower station RCC dam is in the subtropics zone, the high temperature continues very long and the temperature control in dam construction is very difficult.
景洪电站地处亚热带,高气温时间长,大坝碾压混凝土施工温控难度高。
On the basis of examining features of varied seepage prevention structures of RCC dam, the application of seepage prevention structure with asphalt concrete is mainly discussed.
目前在土石坝中已经被广泛的采用,主要介绍了土工膜的防渗形式及防渗结构,根据土石坝不同的情况可因地制宜,灵活选择应用。
In RCC dam construction project, sometimes because of the need for grouting and river diversion, the thin concrete block during long intermittence would be caused after a long idle time.
在碾压混凝土坝施工过程中,有时因为灌浆和导流的需要,基岩上浇筑完基础垫层后长时间停歇,即形成基础垫层长间歇。
That both the structure and material of concrete dams and construction means of earth dams are used in roller compacted concrete dams make RCC dam increasingly used in water engineerings.
碾压混凝土将混凝土坝结构和材料与土石坝施工方法两者的优越性结合起来,在水利工程中得到愈来愈多的运用。
Based on the analysis of the seepage reasons of the roller compacted concrete, a design idea against seepage of the RCC dam is developed in this article, in which anti seepage is the stress.
在碾压混凝土渗透成因分析的基础上,本文提出以防为主,防排结合的碾压混凝土坝体渗控设计概念。
The paper gives a description in detail on RCC raw material test, mix design, intermediate test and selection of various construction methods and parameters in construction of the Huatan RCC dam.
本文根据花滩电站碾压混凝土筑坝施工过程中,从碾压混凝土原材料试验、配比设计、中间试验以及现场施工的各种方法和参数的选用等多方面作了较为详细的阐述。
The author researches the seepage characteristics of Longtan RCC dam by finite element method (FEM), and concludes the best suitable seepage control scheme of the dam after analysis in so many cases.
在对龙滩高碾压混凝土重力坝渗流特性进行分析时,就有关主要渗流影响因素进行众多计算工况的比较分析研究,得出大坝的最终优选渗控方案。
CSG dam is a new dam type which use CSG material and constructed with craft of RCC.
CSG坝是使用CSG材料填筑并采用碾压混凝土坝的施工工艺施工的一种新坝型。
The stress field of RCC gravity dam is the main factor to lead to the dam crack, the stresses caused by the other factors are less than temperature stress field, which function is for controlling.
碾压混凝土坝温度应力是导致坝体裂缝的主要因素,其他荷载所引起的应力与温度应力相比相对较小,温度应力起控制作用。
The author introduces the technique of cantilever turn-over formwork and gallery formwork used for Baise RCC main dam.
介绍了百色碾压混凝土大坝悬臂翻升模板及廊道模板的设计和施工工艺。
The prototype observation items of the Puding RCC arch dam include stress and strain observation, temperature monitoring, observation of joints, crack and seepage pressure.
大坝的原型观测项目有应力应变观测、温度观测、渗流观测、接缝观测和裂缝观测。
Now, the construction technique of rolled concrete dam with high temperature condition is one of the most attended research subjects by the domestic and foreign RCC constructers.
高温条件下碾压混凝土坝(RCC)施工技术已成为国内外从事RCC工作者最受关注的研究课题之一。
In this article three dimension FEM is adopted in the stress analysis of bottom diversion outlet and notch segment of a RCC gravity dam when flowing design flood.
本文采用三维有限元法,对碾压混凝土坝底孔缺口坝段在过流情况下,顶部未到设计龄期的碾压混凝土和大型导流底孔周边的应力分布进行了分析。
RCC technique for dam construction is playing an important role with its unique advantages.
碾压混凝土作为一项筑坝新技术,正以其独特的优点在工程建设中充分发挥作用。
应用推荐