It researches displacement and dam body deformation extent. And it tries to find a control range for RCC gravity-arch dam displacement by comparing with other international projects.
研究坝体变位大小和坝体变形的范围,比较其它工程及国际工程经验,探索碾压混凝土重力拱坝坝体变位控制范围。
The geological condition of Yuanmanguan RCC double-curvature arch dam of very complex, and there are eight crannies and nine faults.
园满贯碾压混凝土双曲拱坝地质条件复杂,坝区内有八组裂隙和九条较发育的小断层。
Thermal load is one of the main loads of arch dam, at present, the method of adopting thermal load of normal concrete in RCC arch dam calculation underestimates the action of temperature.
温度荷载是拱坝最主要的荷载之一,目前,通常采用计算常态混凝土温度荷载的方法计算RCC拱坝,这低估了温降的作用。
It researches the stress condition, stress distribution, location of maximum stress and stress control criteria of RCC gravity-arch dam under different load combinations.
研究碾压混凝土重力拱坝在不同的荷载组合工况下的应力分布状态和分布特征以及最大应力出现的位置和应力控制的标准。
The prototype observation items of the Puding RCC arch dam include stress and strain observation, temperature monitoring, observation of joints, crack and seepage pressure.
大坝的原型观测项目有应力应变观测、温度观测、渗流观测、接缝观测和裂缝观测。
The Linhekou Hydropower Station has a RCC double-curvature arch dam.
蔺河口水电站大坝为碾压混凝土双曲拱坝。
The Linhekou Hydropower Station has a RCC double-curvature arch dam.
蔺河口水电站大坝为碾压混凝土双曲拱坝。