The upper part of shovel plough is provided with a ground break punner with length matched with the shovel plough.
所述的犁铲上部设有长度与犁铲匹配的破土夯;
Analyzing on-site test data, the author provides strong punner construction parameters proper for this project, and concludes and analyzes problems happened in construction.
通过对现场试验资料的分析,提出了适合该工程的强夯施工参数,并对施工中出现的现象进行了总结和分析。
Analyzing on-site test data, the author provides strong punner construction parameters proper for this project, and concludes and analyzes problems happened in construction.
通过对现场试验资料的分析,提出了适合该工程的强夯施工参数,并对施工中出现的现象进行了总结和分析。
应用推荐