During any project implementation, you will find yourself spending a lot of effort on managing the data objects instead of implementing the business logic.
在任何项目实现期间,您都会发现自己花费了大量的精力管理数据对象,而不是进行业务逻辑的实现。
The final decision has to be taken by the KB administrator who understands the data and the business logic of the project.
最终的决策要由知识库管理员做出,因为他们了解项目的数据和业务逻辑。
Each project had a fair amount of custom code in addition to the core logic.
除了核心逻辑之外,每个项目都有大量的自定义代码。
In practice, we find that unless a project is entirely green field, in addition to a top-down analysis, there is a simultaneous bottom-up analysis of pre-existing code and business logic.
我们在实践中发现,除非一个项目是完全空白的,否则,除了进行自上而下的分析外,还需对预先存在的代码和业务逻辑进行自下而上的分析。
The medium-sized project consisted of 34 use cases, and some use-case logic from the first evolution would be reused in the later evolutions.
中型项目包括34 个用例,并且来自第一个演进的一些用例逻辑会在后面的演进中复用。
A mediation module serves as the container for a mediation component and its included logic, and is mapped into a deployable EAR project under the covers.
中介模块用作中介组件及其包含逻辑的容器,并可以在封装的情况下映射到可部署的EAR项目。
These are possible indications, but the decision has to be made according to the project data and business logic needs.
这些只是提示,必须根据项目的数据和业务逻辑需要做出决策。
This allows the reader to realize the versatility of Project Zero combined with new Lotus Domino-specific server-side logic.
这允许读者实现ProjectZero的多功能性,并且能结合新的特定于LotusDomino的服务端逻辑。
Project Zero lets you focus on the core business logic of the application rather than handling incoming Web requests, parsing URLs, and handling various methods.
ProjectZero让您能够专注于应用程序的业务逻辑,而不用为处理传入Web请求、解析URL和处理各种方法大费周折。
First do this for the main business logic project, as shown in Listing 3.
首先为main业务逻辑项目执行该操作,如清单 3 所示。
Now that you've completed the data model and business logic definitions, you need to publish the project to the business Events runtime.
既然您已经完成了数据模式和业务逻辑定义,那么就需要将项目发布到BusinessEvents运行时。
The Trading_Logic project implements the backend logic comprised of EJB 3.0 Stateless Session Beans.
Trading_Logic项目实现由ejb 3.0无状态会话bean组成的后端逻辑。
The EGL Web project contains the EGL code, Web pages, and a sample database, all of which make up the logic, data, and interface of the application.
EGLWeb项目包含EGL代码,Web页,和一个样本数据库,以上所有形成了应用程序的逻辑、数据和接口。
The objective of the project is to provide a complete infrastructure for Web deployment so that application developers are free to concentrate on the business logic.
这个项目的目的是为Web开发提供一个完整的基础设施,让应用程序开发人员可以将注意力集中在业务逻辑上。
In our case project, we use Rational ClearQuest to collect data input, and we use Jmystiq to make automatic validation by creating some logic rules.
在我们的案例项目中,我们使用RationalClearQuest来采集数据输入,并通过创建一些逻辑关系使用Jmystiq来实现自动确认。
An adaptive logic characterizes the project: rather than modifying the existing structure of the pavilions, the proposal is disconnected by its external contour.
该项目有着一个适合的逻辑特征:设计方案没有改变现存的展厅结构,而是被外部轮廓分离。
I have recently inherited a PLC project. We are using Automation Direct PLCs and using the C-more software for writing ladder logic.
我最近继承了一个PLC项目。我们使用的是直接的PLC自动化和使用该软件的编写梯形逻辑。
The new Web project will call a new function of the existing EJB which will implement the new business logic for the Web service.
新Web项目将调用现有EJB的一个新函数,该函数将实现 Web服务的新逻辑。
The construction process follows the same logic and is done manually, accepting the imperfections and the specific circumstances of an open work that enriches the gap between project and construction.
施工的过程遵循了相同的逻辑,而且它是纯手工制作的,建筑接受开放式作业中的不完美和一些特定的情况,以此来缩小项目和施工之间的差距。
Project partners Philips, Thales Avionics LCD and the University of Cambridge's Plastic Logic could use the novel technology to produce flexible displays using existing factories.
项目合作伙伴飞利浦,泰利斯航空电子液晶公司和剑桥大学PlasticLogic公司可以用这种最新的技术和现有的工厂设备来制造柔性显示设备。
This paper introduces the functions of Programmable Logic Controller and some problems in insulation and voltage resistance test, and then it presents a system reconstruction project.
简单介绍了可编程控制器的功能特点及绝缘耐压人工测试中存在的问题,提出了一种利用可编程控制器来实现自动测试的系统改造方案。
Continuous hot dip galvanizing line is a biggish electrical control project which is complex for control logic.
连续热镀锌生产线是较大型的电气控制项目,控制逻辑较为复杂。
Third, through the study on project database, use the data stock of logic level to store the figure restraint and management of the water conservancy drawing-library.
第三,通过对工程数据库的研究,运用逻辑层次数据库存储图形约束及水工图库的管理。
With a great learning capacity, strong organizations, communication, logic, analytical and project management abilities.
学习能力强,具有较强的组织、协调沟通、逻辑分析及项目管理能力。
The command-line compiler has built-in MAKE logic to aid in project maintenance.
命令行编译器使用构造逻辑的方式来维护工程。
The established model has many characters, such as multi-objective for bidding, combined subjective opinion with enlightened logic as well as low leanness on data on past project and competitor.
该模型具有考虑投标的多目标性、承包商的主观判断以及启发式逻辑相结合性以及对过去的工程项目和竞争者数据的低度依赖性等特征。
The established model has many characters, such as multi-objective for bidding, combined subjective opinion with enlightened logic as well as low leanness on data on past project and competitor.
该模型具有考虑投标的多目标性、承包商的主观判断以及启发式逻辑相结合性以及对过去的工程项目和竞争者数据的低度依赖性等特征。
应用推荐