Select a project name in the project list.
在Project列表之中选择一个项目名。
Write your to-do list, project lists down somewhere you can see them often.
接着写一张任务清单,并把它放在你经常能看到的地方。
Write your to-do list, project lists down somewhere you can see them often.Then write a desire and intention list.
接着写一张任务清单,并把它放在你经常能看到的地方。
Through the slope displacement forecasting of the Three Gorges Project list slope and Xintan slide, the results are satisfied.
通过对三峡升船机高边坡和新滩滑坡实际位移数据进行预测,研究了它们的混沌特征,结果令人满意。
Along with the project list, we'll begin writing up case studies of interesting cross industry projects much like we already do with games.
随着项目列表,我们将会开始写一些有关跨行业项目的案例学习,就像我们现在对游戏做的一样。
Since the Project List artifact produced during this phase contains recommendations to commence specific implementations, more rigorous estimation than in phases a and B is required.
由于在这个阶段的产物包括开始具体实施的建议,因此需要比阶段A和B更加严格的评估。
All project is divided into sub engineering quantity list 39, list 13 items measure project and other project list 3 items on the list, and the list of engineering quantity calculation.
清单项包括分部分项工程量清单39项,措施项目清单13项和其他项目清单3项,并对各清单进行了清单工程量计算。
Each project area defines the list of available categories.
每个项目区域都定义了可用分类的列表。
I hope to use this time to gain more experience from the project and draw a list of requirements for future developments.
我希望利用这次机会从项目中获得更多经验,并描绘出未来开发的需求列表。
Based on how you created your JPA project, the defaults should list the correct database and schema.
基于您是如何创建JPA项目的,默认选择是列出适当的数据库与方案。
The system will query the requested project and return with a list of requirements.
该系统将查询悲情球的项目,并且返回一个需求列表。
It is a common practice for projects to develop a risk list early in the project, though fewer projects maintain this list over the full project lifecycle.
这是一个在项目早期显示风险列表是项目的一个普通实践,尽管很少项目在整个项目生命周期中保留这份列表。
When using the iterative development approach embodied in RUP, the project manager maintains a list of risks sorted by likelihood of occurrence and impact.
当使用RUP中具体化的迭代开发方法时,项目经理保留着一个按照出现和影响可能性排列的风险列表。
Many projects collect a risk list, usually early in the project; but unless the risk list is used as a key management tool, it will do little good.
很多项目都收集了一个风险表,通常在项目的前期,但是除非这个风险表是很关键的管理工具,否则基本上不起作用。
Don't hire a new employee if you have neither a big project nor a waiting list of clients lined up.
在你获得大的项目或制作好关于想要找你做项目的潜在客户列表前,不要雇佣新员工。
A comprehensive list of project dependencies, assumptions, and risks, with backup plans.
带有备份计划的项目可依赖性、假设和风险的综合列表。
A comprehensive list of project deliverables for each checkpoint.
每个检查点的项目可交付性的综合列表。
The software/hardware requirements list for this project.
项目的软件/硬件需求列表。
There is minimal code difference between a contacts list and a project task list.
联系人列表和项目任务列表之间的代码差异非常小。
Whatever the risk(s) may be, it's important that they are captured in the project risk list.
不论风险是什么,重要的是它们都列在项目风险列表中。
A collections TAB on the project dashboard provides a list of collections for the project.
项目操作板上的集合项为项目提供了一个列表的集合。
By far the most ambitious project on CGIAR's list, though, involves transforming the way in which rice photosynthesises. That will require some serious genetic restructuring.
不过就目前而言,CGIAR开展的研究项目中最具有挑战性的还是改变水稻光合作用的途径,这就必须进行一丝不苟的基因重组。
In the right upper corner on the project TAB, you can see the list of project assets such as orchestrations, endpoints, transformations, and XML schemas.
在项目的右上角,您可以看到例如编排,端点、转换以及XML模式等项目资产列表。
A list of major checkpoint project deliverables (including user documents) and schedules.
主要检查点项目可交付性的列表(包括用户文档)和时间表。
In the New Project wizard, from the list on the left, click Simple, and on the right, Project, then Next.
在新项目向导中,从左侧列表中单击Simple,然后在右侧依次单击project、Next。
Dependencies: the list of project names in the dependencies.
依赖关系中项目名称的列表。
One interesting measure of fetchmail's success is the sheer size of the project beta list, fetchmail-friends.
这个项目庞大的公测名单(我称之为“fetchmail之友”)成为衡量fetchmail成功的重要标准。
Dependencies: the list of String objects containing the project names to add to the project dependencies list.
一组应该被添加到项目依赖关系列表中包含项目名称的字符串对象。
Your project might make it onto this list five years from now.
也许您的项目5年以内会一直出现在这个列表中。
When you create a new project, the list of Approved Actions is taken from the Role Label.
当您创建一个新项目时,已许可操作的列表来自Role标签。
应用推荐