This article analyses the factors and adjustment method of material price difference for large-scale projects, and then presents the merit and disadvantage of different adjusting methods.
本文对大型工程项目材料价差的调整要素、调整方法进行了分析,并提出了选用不同调整方法的利弊。
This article analyses the factors and adjustment method of material price difference for large-scale projects, and then presents the merit and disadvantage of different adjusting methods.
对公路工程项目材差的调整要素、调整方法以及对不同调整方法的选用提出了具体做法,对指导公路工程建设具有较好的参考价值。
In the end, provides the coping strategy to the contract price adjustment coursed by the difference of quantities under the condition of the lump sum contract.
最后,基础上述分析,给出总价合同工程量差异出现后的调整策略。
Party a shall not be responsible for the price difference compensation for the purchase activity occurred before the price adjustment.
对于甲方进行产品价格体系调整前(以甲方正式执行调整后的新价格体系日期为准)已经发生采购的行为,甲方不负责进行差价补偿。
This article analyses the factors and adjustment method of material price difference for large-scale projects, and then presents the merit and disadvantage of different adjusting methods.
对高速公路工程项目材料差价的调整要素、调整方法进行了简述,并对不同调整方法的选用提出了具体的做法,对指导高速公路工程建设具有较高的参考价值。
Both parties agree, shall the quality of the loaded cargo difference from of the quality as stipulated in article 1 aforementioned, the following price adjustment shall be effect.
双方同意如果实际装运的货物与合同的第一条规定的质量有差别,则价格将有所调整。
The paper proposed specific methods for adjustment factors, methods and choice of materials price difference for highway engineering project.
本文对大型工程项目材料价差的调整要素、调整方法进行了分析,并提出了选用不同调整方法的利弊。
The paper proposed specific methods for adjustment factors, methods and choice of materials price difference for highway engineering project.
本文对大型工程项目材料价差的调整要素、调整方法进行了分析,并提出了选用不同调整方法的利弊。
应用推荐