• A hydroelectric plant by the huge dam is idle.

    水库一个水电站处于闲置。

    youdao

  • One aim was to clear the road to the Kajaki dam to allow the refurbishment of a hydroelectric plant.

    个任务清扫通向贾基大坝道路整修座水电站。

    youdao

  • Indeed, Mozambique already has Africa's most powerful hydroelectric plant, the state-owned HCB power-station on the Cahora Bassa dam at Songo, some 200km (124 miles) north-west of Tete.

    的确莫桑比克已经拥有了非洲大陆具能量水力电气工厂,即位于太特城西北面200公里处松戈卡堡拉-巴萨大坝国有hcb发电站。

    youdao

  • One of the main sources of acrimony is Tajikistan’s long-planned construction of a dam and hydroelectric power-plant, which will provide a much-needed supply of steady electricity.

    矛盾源头主要塔吉克斯坦计划建设一个大坝以及水力发电站用以稳定提供大量的电力

    youdao

  • The power for the factory is as pristine as the surroundings: it comes from a nearby hydroelectric plant.

    这个工厂所使用能源周边的环境一样洁净来自附近一个水利电气工厂。

    youdao

  • A brief introduction is given about the structure. function and fault diagnosis system formed by overall distributed controlled network in hydroelectric plant.

    简介了全分布式控制网络构成水电厂微机监测系统的结构、功能故障诊断系统。

    youdao

  • If there is a hydroelectric plant at the waterfall, the energy of the falling water is used to drive the turbines.

    假如瀑布附近水电站,那么利用流下能量驱动涡轮机

    youdao

  • The environment impact synthetic assessment and construction scheme optimum selection problem of hydroelectric plant on the basis of catastrophe theory is approached.

    基于突变理论水电站环境影响综合评价建设方案优选问题进行了探讨

    youdao

  • The Itaipu hydroelectric power plant is one of the largest constructions of its kind in the world.

    伊泰普水电站世界同类建筑最大一个

    youdao

  • Nearly all circuits in a hydroelectric plant are provided with circuit breakers so that the current may be switched off or on as the occasion demands .

    几乎所有电路水电厂提供断路器使现行的路线有必要时可以关掉

    youdao

  • In order to make optimal operation calculation of small hydroplant more accurate and rational, head loss of hydroelectric plant with complex diversion system is analyzed in this paper.

    为了使小型水电站厂内优化运行计算结果准确合理具有复杂引水系统的小型水电站引水损失情况进行了分析。

    youdao

  • A waterfall, 74.7 m (245 ft) high, of the upper Churchill River in southwest Labrador, Canada. There is an enormous hydroelectric power plant at the falls.

    丘吉尔瀑布,大瀑布:落差约74.7(245英尺)瀑布,位于加拿大拉布拉多西南丘吉尔河上游。瀑布下一个巨大水电站

    youdao

  • In the process of making optimal load dispatch plan in hydroelectric plants, it is usually supposed that the water head of the hydroelectric plant is not changing.

    水电站制定内机组最优负荷分配一般假设水电站水头不变

    youdao

  • A city of eastern Wisconsin on the Fox River southwest of Green Bay. The first hydroelectric plant in the United States was built here in 882. Population, '5,' 95.

    美国威斯康星州东部城市,位于格林西南福克斯河岸。882年美国第一水电站在此建立人口'5,' 95。

    youdao

  • The TGPs third stage river closure is a key works for the early stage cofferdam supported power generation and guarantee of the successive construction of hydroelectric plant and dam at right bank.

    三峡工程第三截流工程确保实现初期围堰挡水发电同时修建右岸大坝电厂关键性工程。

    youdao

  • The water volume of the rivers in Iguaçu not only makes a natural wonder of waterfall, but also provides a natural advantage to build the Iguaçu hydroelectric power plant.

    伊瓜苏河水流量之大,不仅造就了自然瀑布奇景,而且成就了伊泰普水电站

    youdao

  • As the diversion tunnel of Ertan Hydroelectric plant has big dimensions and high initial ground stress, the new conception and method are used in design.

    二滩水电站导流隧洞规模初始地应力,设计采用现代地下结构设计理论方法

    youdao

  • Cossebaude is also part of the enormous Niederwartha pumped storage hydroelectric plant.

    科瑟包德也是巨大niederwartha抽水蓄能水电厂的一部分

    youdao

  • The dam of Changhu hydroelectric plant has operated for 18 years since 1972.

    湖水电站大坝,自1972投入运行至今18年之久。

    youdao

  • YDT_3000 governor adopted in Xiangshan hydroelectric Plant is the typical electric hydraulic governor. At present, it is mainly adopted in domestic middle and small_sized hydroelectric stations.

    象山水电厂使用的YDT_3 0 0 0型调速器典型的中型模拟电路形式的电气液压调速器,目前国内、小型水电站中多有应用。

    youdao

  • The flood discharge and energy dissipation of Xiluodu Hydroelectric Plant are characterized with narrow valley, big flood discharge capacity and high head.

    洛渡水电站泄洪具有河谷狭窄、泄洪流量、泄洪水头高的特点。

    youdao

  • Though the range of water head is not too wide, maximum efficiency of Goupitan hydroelectric plant is very high and weighted efficiency focus on rated head wide range in flow.

    尽管滩电站水头变幅并不,但最高效率要求较高而且设计水头附近横向值大。

    youdao

  • The Feilaixia Hydropower Station is located at the middle-stream of the North River and it is a typical low-head stream-flow hydroelectric plant.

    飞来峡水利枢纽电站位于北江干流中游,典型的低水头径流式电站。

    youdao

  • The first hydroelectric plant in the United States was built here in 1882.

    1882年美国第一水电站在此建立

    youdao

  • The application of the PLC in the automation system of sluices, which are in the hydroelectric plant is introduced.

    介绍了PLC水电厂泄水闸门控制系统中的应用

    youdao

  • The geological conditions of this underground hydroelectric power plant is very com - plex.

    电站地下厂房地质条件比较复杂

    youdao

  • Hydroelectric plant operation is based on an operation chart. Most of the existing literatures, however, paid much more attention to the single reservoir chart than cascade reservoirs.

    水库调度水电站发电调度运行基础然而现有研究和算法大都集中库调度图,库群发电调度图成果较少。

    youdao

  • Hydroelectric plant operation is based on an operation chart. Most of the existing literatures, however, paid much more attention to the single reservoir chart than cascade reservoirs.

    水库调度水电站发电调度运行基础然而现有研究和算法大都集中库调度图,库群发电调度图成果较少。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定