The structure reliability assessment (SRA) is one of the most effective methods in pipeline risk management.
结构可靠性评估(SRA)方法是管道风险管理中最有效的方法之一。
Described are pipeline risk assessment, risk control, performance measure and response according to the pipeline risk management process.
按照管道风险管理的流程分别对管道风险评价、风险控制和决策支持、效能测试和响应进行了论述。
The second part of content mainly for the product oil pipeline risk management technology, including the risk quantification, the risk controls two major segments.
第二部分内容主要为成品油管道的风险管理技术,其中包括风险量化、风险控制两个部分。
An understanding of risk, and how it can be controlled was at the heart of a pipeline integrity management system.
在管线的完整性管理系统中,其核心是对风险的理解和如何控制风险。
Pipeline Risk-Based inspection (RBI) is an expression of the conception of the pipeline integrity management in maintenance and inspection.
基于风险的检测(RBI)是管道完整性管理思想在维修检测中的具体体现。
Gas pipeline risk grounded on GIS database instruct daily management of pipeline network by objective analysis and decision, reducing pipeline accident and work load of routine maintenance.
基于GIS数据库的燃气管道风险评估能指导燃气管道日常运行管理,对其进行较为客观的分析和决策,减少管道事故的发生和日常维护的工作量。
Some codes and standards about pipeline integrity management and how to implement the risk based integrity management were introduced here.
本文介绍基于风险的管线完整性管理的相应规程以及针对长输管线的完整性管理的过程和方法。
Risk based pipeline integrity management programs were implemented by pipeline companied worldwide.
基于风险的管线完整性管理在全世界范围内得到应用。
Risk management can effectively enhance safety and economic benefit for oil and gas pipeline.
风险管理可以有效提高油气输送管道的安全性,获得较高的社会效益和经济效益。
An understanding of risk, and how it can be controlled was at the heart of a pipeline integrity management system. R...
在管线的完整性管理系统中,其核心是对风险的理解和如何控制风险。
An understanding of risk, and how it can be controlled was at the heart of a pipeline integrity management system. Risk analysis...
在管线的完整性管理系统中,其核心是对风险的理解和如何控制风险。
Long Pipeline; Risk Management; Construction Phase; Fuzzy Aggregative Risk Assessment.
长输管道;风险管理;施工阶段;模糊综合评价。
The application process that index risk assessment and the fuzzy comprehensive assessment method are applied to safe management of city gas pipeline is given.
详细阐述了指数评价法和模糊综合评审在城市燃气管网风险评价中的应用过程。
The application process that index risk assessment and the fuzzy comprehensive assessment method are applied to safe management of city gas pipeline is given.
详细阐述了指数评价法和模糊综合评审在城市燃气管网风险评价中的应用过程。
应用推荐