In floating offshore operations, the choke and kill lines exit the subsea BOP stack and then run along the outside of the drilling riser to the surface.
在进行浮动的海上作业时,节流和压井管线从水下防喷器组出来,之后沿钻井隔水导管外侧面到达水面。
The floating caisson construction method can also be applied to river channel power stations, ports, offshore drilling platforms, subaqueous tunnels, Bridges, locks, etc.
浮运法施工技术在河床式水电站、码头、海上采油平台、过江(海底)隧道、桥梁、水闸等工程中也有广泛的应用前景。
The floating caisson construction method can also be applied to river channel power stations, ports, offshore drilling platforms, subaqueous tunnels, Bridges, locks, etc.
浮运法施工技术在河床式水电站、码头、海上采油平台、过江(海底)隧道、桥梁、水闸等工程中也有广泛的应用前景。
应用推荐