• The third logic value (the middle value) can be used as a fault indicating signal, or in off-line testing.

    第三个逻辑(中间逻辑值)用作故障指示信号脱机测试时应用。

    youdao

  • By comparing the two step testing of both static and dynamic, we can realize the off line debugging of the submodular circuit board.

    采用静态动态测试比较可以实现子模块电路板脱机调试

    youdao

  • This program may serve as the basis on which a computer self-tuning regula-tor is actually designed on spot as well as to be a tool for off-line testing the unit controlled.

    程序可用作被控装置离线试验,亦可用作现场计算机校正调节器程序设计依据

    youdao

  • Off-line signal timing plans is one of the most common traffic signal control plans currently. And the Green Conflict testing between two phases is the safe guarantee of the timing plans.

    使用脱机信号方案目前常用交通信号控制方法,信号相位之间绿冲突检验是配时方案安全保证

    youdao

  • Off-line signal timing plans is one of the most common traffic signal control plans currently. And the Green Conflict testing between two phases is the safe guarantee of the timing plans.

    使用脱机信号方案目前常用交通信号控制方法,信号相位之间绿冲突检验是配时方案安全保证

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定