The minimum duration the agent can be turned on is one day.
代理可以开启的最短持续时间为一天。
It is suggested that to see physiological adaptations from resistance training, a minimum duration should be at least 6-8 weeks.
它建议要从抗阻练习中去发现生理适应能力,最短的持续时间应为6 - 8周。
The mean duration of follow-up was twenty-four months, and all patients with a minimum duration of follow-up of six months were included.
平均随访周期为24个月,全部至少已经随访6个月的患者均纳入本研究。
Minimum and maximum values get displayed when duration/interval value is specified.
在指定持续时间/间隔值时将显示最小和最大值。
Snow cover duration was also at a record minimum, going back to since record-keeping began in 1966.
积雪覆盖的持续时间也是自1966年开始记录以来最短的。
Short duration drops below the minimum VCC specification of several microseconds or less are ignored by the UVLO.
低于最低的VCC几微秒或以下规格的短时下降被忽略的uvlo门。
The optimal size of resource is, therefore, defined as the minimum size of resource required to keep the project duration a minimum.
最佳大小的资源,所以被界定为最小尺寸的资源必须保持项目持续时间减少到最低限度。
Treatment was continued for a minimum of 6 months and a maximum of 15 months, and event rates were recorded for the duration of treatment.
疗程最短6个月,最长则15个月,治疗期间的事件发生率被记录在案。
The program of study in Alberta must have been at least one year (i. e. minimum of two semesters of full-time study, or equivalent) in duration.
在阿尔伯塔省完成的学习项目时间至少达一年(相当于两个学期的全日制学习)。
The duration of such leave and the minimum wage standards for leaves other than unspecified casual leave shall be prescribed by the Central Competent Authority.
请假应给之假期及事假以外期间内工资给付之最低标准,由中央主管机关定之。
Results: After a mean duration of follow-up of forty-one months (minimum, two years), the medial clear space, talocrural angle, and talar tilt had improved.
结果:经过平均41个月(最少2年)的随访期后,内距胫间隙、距胫腓角和距骨倾斜度获得改善。
The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward. Finally a scheduling example is given to prove the methods' validity.
然后,以工期最小为目标与工期-成本权衡目标建立关键链识别方法模型,并通过算例验证了该方法的有效性。
The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward. Finally a scheduling example is given to prove the methods' validity.
然后,以工期最小为目标与工期-成本权衡目标建立关键链识别方法模型,并通过算例验证了该方法的有效性。
应用推荐