CHAPTER II GUARANTEES FOR SAFETY IN MINE construction.
第二章矿山建设的安全保障。
Drilling and blasting are important components in mine construction design.
钻眼爆破工作是矿山施工设计的重要组成部分。
Mine cross middle line point is widely used in mine construction and production.
矿井十字中线点在建井和生产过程中使用较多。
Recommendations of design for large fan unit in coal mine construction from now on are raised.
对今后煤矿建设中大型通风机装置的设计提出了建议。
A mine water disaster is a natural disaster often occurred in mine construction and production.
水患是矿山建设和生产中经常遇到的自然灾害。
Underground tunnel support of soft expansion rock is a main difficulty in mine construction currently.
松软臌胀岩层的井下巷道支护是目前矿山建设中的一个主要难点。
Open pit mining production scheduling is of guidance significance to the mine construction and balanced production.
采掘进度计划对矿山建设和均衡生产具有指导作用。
Tunnels are the core of mine projects, and 3D tunnel modeling is an important component of digital mine construction.
巷道是矿山工程的核心,巷道三维建模是数字矿山建设的重要组成部分。
The prevention of freezing pipe breaks in deep shaft freezing has become a key technique in mine construction in China.
防止冻结管断裂在国内深井冻结中已成为关键技术。
Taking a mine construction project as an example, studies the EPC + IS project management mode of the concrete operation process.
以某矿山建设项目为例,对EPC +IS工程管理模式的具体运作流程进行阐释。
There distributes a great number of karst caves in southwest of Guizhou province and they bring great difficulties to mine construction.
中国黔西南地区溶洞较多,岩溶地区实施矿山工程难度大。
Optimizing the Construction Organization Planning, Decreasing the Tunes of Uncovering Coal Seam, Shortening the Period of Mine Construction.
优化施工组织设计,减少揭煤次数,缩短建井工期。
The research on structural development pattern and genetic mechanism provided mine construction and production with geological basis henceforth.
赵楼井田构造发育规律及成因机制的研究为今后矿井建设与生产提供了地质依据。
The geological conditions of strong weathering and freeze thawing in western plateau region brought an unprecedented challenge to the mine construction.
西部高原地区以其强风化、常冻融的地质条件给矿山施工带来前所未有的挑战。
The green mine construction is one kind of production pattern and its purpose is to reach the lowest affect on environment from mining industry activity.
绿色矿山建设是一种洁净生产模式,目的是使矿业活动对环境的有害影响达到最低。
Article 12 Mine construction projects must be constructed in accordance with the design papers approved by the authorities in charge of mining enterprises.
第十二条矿山建设工程必许按照管理矿山企业的主管部门批准的设计文件施工。
The acceptance check of safety evaluation for non-coal mine is one of the main basis for safety inspection and approval of non-coal mine construction project.
非煤矿山安全验收评价是矿山建设项目安全验收与审批的主要依据之一。
The mine construction technology in deep and thick alluvium associated with the practical situation of Juye Zhaolou mine are talked about and summarized in this paper.
本文结合巨野矿区赵楼矿井实际建设情况对深厚冲积层建井技术进行了探讨和总结。
The transformation scheme and the operation situation of the scheme of the transformation in Mine Construction Corporation is mainly expounded, investigated and analyzed.
第四章,阐述了太钢矿建公司的改制背景、存在问题,并对改制方案的实施情况进行了重点阐述、研究和分析。
Frozen method has more and more been used in mine construction, the influence of frost heave on construction should not be ignored. and it is very necessary to study the frost heave.
冻结法在矿山建设方面应用已越来越多,冻胀对施工的影响也不容忽视,对冻胀进行研究很有必要。
The paper, based on the analysis of digital mine definition, elaborates the main characteristics of digital mine and proposes the main contents of digital mine construction in China.
通过对数字矿山定义的分析,阐述了数字矿山的主要特征并据此提出了我国数字矿山建设的主要内容。
This paper introduces the principles of ADS40 digital aerial camera, and expounds the application of ADS40 digital aerial camera in the coal mine monitoring and the digital mine construction.
介绍了ADS40数字航摄仪的原理,阐述了ADS40数字航摄仪在煤矿监测方面和数字矿山建设方面的应用情况。
The coal mine enterprise also be longed for with the geographic information system carries on each kind of auxiliary decision-making and manages as well as carries on the digital mine construction.
煤矿企业也渴望借助于地理信息系统来进行各种辅助决策和管理以及进行数字矿山建设。
The paper provides a diversified forms of information management platform by binding of GIS and mines safety production information. Thus it's a exploring and attempting in mine construction of GIS.
本文将煤矿的安全生产信息和GIS电子地图信息相结合,为管理者提供一个形式多样化的信息管理平台,是对矿山GIS的建设在理论和方法上的探索与尝试。
Construction of a new shaft of the mine with diameter of 8 meters was completed in 2000. The widest shaft in Russia allows to take down large equipment.
直径为8米的新竖井工程已于2000年完成,该竖井为俄罗斯最宽的竖井,可以向下运送大型设备。
Construction of a new shaft of the mine with diameter of 8 meters was completed in 2000. The widest shaft in Russia allows to take down large equipment.
直径为8米的新竖井工程已于2000年完成,该竖井为俄罗斯最宽的竖井,可以向下运送大型设备。
应用推荐