The paper mainly describes the method of piling in pilot tunnel used in construction of the principal part of Dongdan Subway Station in Beijing.
主要介绍北京地铁东单车站采用洞桩支承法进行车站主体工程施工的方法。
The paper mainly describes the method of piling in pilot tunnel used in construction of the principal part of Dongdan Subway Station in Beijing.
主要介绍北京地铁东单车站采用洞桩支承法进行车站主体工程施工的方法。
应用推荐