This paper describes the model test for stability of the Changzhao rubble masonry dam with concrete mortar.
本文介绍了长诏水库混凝土砌石坝的稳定性模型试验的情况。
This article describes briefly the design and economics of masonry dam, as well as the conventional practice used in its construction in Hunan province.
本文论述砌石坝的设计及其经济性,并介绍湖南省兴建砌石坝的实际经验。
All the inner and outer factors which affect the safety of the masonry dam are analyzed systematically, and the destructive mechanism of the masonry gravity dam is discussed in detail.
系统分析了影响浆砌石坝安全的各种内在因素和外在因素,详细介绍了这些安全因子的影响程度,深入探讨了浆砌石坝的破坏机理。
The apparent density of stone masonry of gravity DAMS is very important to dam safety.
重力坝砌体容重对大坝的安全影响很大。
Masonry-gravity dam, build at the narrow gully section of the small or very small basins, is a kind of retaining works of debris flow in common use.
圬工重力坝是泥石流工程防治常用的一种坝型,多建于特小流域或小流域沟谷的狭窄地段。
Seepage proof facing plate or watertight concrete layer often locates in stone masonry arch dam.
在上游面或内部偏上游处设置了混凝土防渗层的砌石拱坝为成层异弹模坝。
In the reinforcement and leakage-proof of the masonry arch dam, we had the first attempt and achieved good results.
我们在浆砌石拱坝防渗加固中进行了首次尝试,取得了良好的效果。
Yangmingsha Hydropower station dam is a C15 small size aggregate concrete stone masonry double curvature arch dam with crest spillway and flip buckets for energy dissipation.
阳明山水电站拦河坝采用C15细石混凝土砌石双曲拱坝,坝顶表孔泄洪,挑流消能。
Because of its economy and safety, the masonry gravity dam is used in many medium and small-sized engineering.
浆砌石重力坝由于其经济性和安全性,在很多中小型工程中被采用。
The outline of the masonry arch dam is double-curved, the dam body is impervious, the crest spillway is built of slotted-type bucket and the mid-discharge orifice is slit-type bucket.
模型试验和实际运行表明,浆砌石拱坝体型、坝体防渗及泄水建筑物等设计是成功的。
Retaining structure of masonry arch dam, diversion system for pressurized water diversion, plant-plant to the ground.
挡水建筑物为浆砌石拱坝,引水系统为有压引水,厂房为地面式厂房。
In order to prevent seepage in stone masonry arch DAMS, the dam body is usually composed of different materials.
砌石拱坝为了防渗通常使坝体由不同材料组成,由于不同的材料具有不同的弹性模量,这类坝可称为成层异弹模拱坝。
In order to prevent seepage in stone masonry arch DAMS, the dam body is usually composed of different materials.
砌石拱坝为了防渗通常使坝体由不同材料组成,由于不同的材料具有不同的弹性模量,这类坝可称为成层异弹模拱坝。
应用推荐