Resting on the Jumeirah Beach, an automatic train will carry guests from dry land through a 515-meter long tunnel underwater into the hotel lobby.
游客可以在Jumeirah沙滩上乘坐自动列车,穿过515米长的水下通道来到酒店大堂。
Resting on the Jumeirah Beach, an automatic train will carry guests from dry land through a 515-meter long tunnel underwater into the hotel lobby.
游客可以在Jumeirah沙滩上乘坐自动列车,穿过515米长的水下通道来到酒店大堂。
应用推荐