• The necessity and feasibility of the integration of process planning and production scheduling and the relations between CAPP and shop job scheduling are analyzed.

    工艺设计生产调度集成必要性可行性进行了分析,讨论了工艺设计车间作业计划之间关系

    youdao

  • MRP system is not very efficient in production planning and control of job shop, especially of the one that contains three-level structure: shop, subshop and workgroup.

    物料需求计划MRP系统对于车间层,尤其是基于车间-工段-班组车间层的作业计划控制不是有效的。

    youdao

  • WLC is a hierarchical production planning and control approach for job shop manufacturing, and suitable for make-to-order industry.

    生产负荷控制一种面向订货生产方式生产计划控制技术。

    youdao

  • WLC is a hierarchical production planning and control approach for job shop manufacturing, and suitable for make-to-order industry.

    生产负荷控制一种面向订货生产方式生产计划控制技术。

    youdao