• Theoretically, the jacking force can be enhanced arbitrarily, so the jacking distance can reach arbitrary length.

    从理论上讲千斤顶可以任意进步,从而达到任意长度推顶间隔

    youdao

  • From the technology of reducing friction slurry and the relay jacks, the jacking force of long pipe jacking has been analyzed.

    触变泥浆减摩技术中继接力技术两个方面对超长距离施工中的顶推力进行了研究。

    youdao

  • The jacking force has apparent effects on displacement and stress distribution of segments, and it is the most adverse load case during construction stage.

    千斤顶顶施工阶段管片位移应力明显影响,千斤顶顶力作用管片施工状态下不利工况

    youdao

  • Then considering the friction forces on the well sides and well bottom, the permissible jacking force was calculated through the horizontal forces balance of the whole working well.

    考虑沉井底部侧壁阻力,由沉井整体水平向受力平衡计算允许

    youdao

  • When the resistive moment of surrounding soil is less than the torsional moment of eccentric jacking force, stability failure of pipeline occurs and pipes deviates from the designed axes.

    管道由于管道周围土体提供抵抗力矩小于偏心推力产生扭转力矩,造成管节偏离设计轴线。

    youdao

  • In construction of pipe jacking, the wall of working shaft and soil body behind the sidewall offers enormous supporting force to a lift.

    施工中,千斤顶支座需要巨大的反力支持这些反力是工作的侧壁以及壁土体提供的。

    youdao

  • The top beam shall be arranged on transverse partition boards within the box. the beam jacking process shall be slow so as to avoid uneven force bearing of jacks.

    位置设在箱内隔板上,过程缓慢进行,防止出现千斤顶受力不均的情况。

    youdao

  • The construction of Pipe Jacking is beset with difficulty due to the large propulsive force for several years.

    口径长距离施工顶进推力过大困扰顶管施工多年的技术难题

    youdao

  • In the jacking point, the water flow approximation, the impact force is big, can not meet the flow outside the flow, the defense is difficult.

    水流逼近冲击力无法托水流外移防守困难

    youdao

  • Field data were analyzed. It showed that axis force increased along with pipe jacking at the very start, and it maintained stated basically when jacking to a certain distance.

    实测数据分析表明管节开始随顶进距离增大而增大,顶进一定距离后,基本维持一定范围内。

    youdao

  • Field data were analyzed. It showed that axis force increased along with pipe jacking at the very start, and it maintained stated basically when jacking to a certain distance.

    实测数据分析表明管节开始随顶进距离增大而增大,顶进一定距离后,基本维持一定范围内。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定