• After construction of the insulation lagging is completed and accepted by inspection, operating the insulated layer shall be carried out timely.

    隔热施工完毕检查通过及时铺设防水层。

    youdao

  • After construction of the insulation lagging is completed and accepted by inspection, operating the insulated layer shall be carried out timely.

    隔热施工完毕检查通过及时铺设防水层。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定