• Entire design process including four partial contents: Hydrology computation, superstructure design, substructure design, construction technological design.

    整个设计过程包括部分内容水文计算上部结构设计,下部结构设计,施工工艺设计。

    youdao

  • Engaged in the research on water resources and hydrology, especially familiar with hydrologic analysis, hydrologic computation, water resources planning, flood control system planning and management.

    长期从事水文资源科研工作,水文分析计算水资源规划防洪系统的规划管理等领域有较高的造诣。

    youdao

  • Engaged in the research on water resources and hydrology, especially familiar with hydrologic analysis, hydrologic computation, water resources planning, flood control system planning and management.

    长期从事水文资源科研工作,水文分析计算水资源规划防洪系统的规划管理等领域有较高的造诣。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定