The main parameters of the hydraulic support, such as working resistance, setting load and support height, are analyzed and its main structures are design.
本文对该类支架的工作阻力、初撑力、支护高度等主要参数进行了分析计算,并对其主要结构进行了设计。
The influences of column diameter and height on the countercurrent flotation process were discussed, and the new concepts of choked air bubbles and area load were put forward.
论述了柱径与柱高对逆流浮选柱浮选过程的影响,提出了气阻、面积负荷的概念。
With the increase of vertical load and height of ground wheel, ground wheel slide can be reduced.
随着地轮垂直载荷的增加、抓地板高度的加大,地轮滑移率的均值、方差都减少。
The structure of stanchions, such as materials, dimensions, height, space and fixing types are all the design parameters for the horizontal concentrated load.
立柱的结构,例如材料,尺寸,高度,立柱的间距,安装的型式等都是水平集中荷载的设计参数。
The result shows that load, seal gap and seal height have influence on the maximum stress while friction coefficient has little influence on it.
分析表明,载荷、密封间隙、橡胶密封筒高度对应力最大值有影响,而摩擦系数影响很小。
Load distribution of axial fan along to the blade and blade height is put forward according to dynamic design method of quintic equation.
提出了轴流通风机沿叶片叶高的载荷分布,按五次方流型设计的方法。
Change in height of specimen after 24 hours under a specified load.
被描述为在规定负荷下,24小时后试样高度变化的百分比。
The materials of tube for loading particles and the load height have less effect on the apparent mass burning rate.
装填药粒用的壳体材料和药粒装填高度对传火速度的影响不显著。
The drum height and haulage speed both are adjusted automatically by using intelligent controlled system to make the load of cutter smooth.
采用智能化控制系统自动调节滚筒高度及牵引速度,使采煤机负载趋于平滑。
There appears some flexibility at the top of tower with high ratio of height to diameter (H/D), caused by wind load.
高径比(H/D)较大的塔在风载荷的作用下,在塔顶处会引起一定的静挠度。
These load cells are notable for high accuracy and low overall height.
这款测压元件特别适合于高精度和整体高度低的情况。
Also visible is the effect of the in situ stress condition on the rock load height (RLH).
也可见的影响是就地胁迫条件下在岩石上负荷高(RLH)。
Enlarged toe piles embedded in weak-rock foundation is adopted in Nanning Diwang Commerce Center for the height of the building is great and the load on it is large.
南宁市地王商会中心的楼层高、荷载大,其基础采用了软岩扩底桩。
The main parameters of the hydraulic support, such as working resistance, setting load and support height are analyzed.
对该类支架的工作阻力、初撑力、支护高度等主要参数进行了分析计算。
The installation of machine tools within the region, if the ground plane height difference over the adjustment range of this product, you can set the machine and load has increased by pads.
机床的安装区域内,如果地基平面的高度差超过本产品的调节范围时,可以在机床与负荷盘间增加垫片。
From all the above figures it is clear that more or less curvilinear decline in the rock load height (RLH) with RMR is seen.
从以上的数据很明显,或多或少在磐石中负荷曲线下降RLH RMR与高度见过。
Outstanding characteristics of high fill projects are there are great fill height and large foundation deformation and self-deformation under fill load.
高填方工程最明显的特点是填方高度大,填料自重应力引起的填筑体的自身压缩沉降及地基沉降较大。
Effect of depth of cover, h: as the rock mass rating RMR values of all eighteen mines were different, a direct plot between rock load height (RLH) and depth is not possible.
效果的埋深、H:随着RM R岩体评分值是不同的,十八个矿山岩石负荷之间有直接的情节和深度RLH高度是不可能的。
The forked connecting strap is fastened in 2 points, over shoulder height, ensuring a proper load distribution and a correct landing position in case of deployment.
分叉连接的皮带在肩膀高度2点中被紧固,以保证适当的负荷分配和正确的着陆位置。
Greater height entails increased column and beam sizes to make buildings more rigid so that under wind load they will not sway beyond an acceptable limit.
更大高度要求增加柱和梁的尺寸以使建筑物更加坚固,在风荷载作用下建筑物才不会产生超过一个可接受限度的摆动。
The settlement of the bucket increases with the increase of load amplitude and the weight of structure and the decrease of the bucket height (with the same bucket diameter).
随着载荷幅值的增加、结构重的增加和桶高的减小(桶直径相同),桶的沉降增加。
Choose the right height can make the bearing spacer after assembly has the required pre-load.
选择合适的隔圈高度可以使轴承装配后具有所需的预载荷。
Must ensure that the load is not higher than the height of the air outlet.
一定要保证装载货物高度不高于出风口的平衡高度。
The shot blasting and paint coating make the iron surface elegant and anticorrosive. Low height design makes load and unload by forklift convenient.
表面经抛丸、喷塑处理,美观耐用,整体高度低,便于铲车加载、卸载货物。
The load transfer of B0+B0-B0+B0 locomotive with different traction schemes was calculated, basing on the definition of nominal and transitional and equivalent traction height.
针对B0+B0-B0+B0轴式八轴机车不同的牵引方案,在定义了名义牵引高、过渡牵引高和等效牵引高的基础上,进行了轴重转移的计算分析。
To analyzed the single-layer reticulated domes of difference ratios of height to span and discover that the increment of the ratios of height to span, dynamic stability critical load decreases.
对不同矢跨比的单层球面网壳结构进行了分析,发现随着矢跨比的增大,动力稳定临界荷载减小。
Reach working height of up to 16m, and the load of up to 250kg.
该系列高空作业平台工作高度最大可达16米,额定载荷可达250公斤。
With the decrease of stud spacing and height, screws spacing, the wall's load capacity increases obviously.
随着墙架柱间距缩小、墙体高度减小、自攻螺钉间距加密,墙体抗剪承载力明显增加。
With the decrease of stud spacing and height, screws spacing, the wall's load capacity increases obviously.
随着墙架柱间距缩小、墙体高度减小、自攻螺钉间距加密,墙体抗剪承载力明显增加。
应用推荐