The feature of landslide time space movement was a geological process of landslide geological mass from a state to a other state under internal and external factors action.
滑坡时空运动特征是滑坡地质体在内因和外因共同作用下,自一种状态向另一种状态转化的地质过程。
Several other mass extinctions in the geological record have been tentatively identified with large impacts, but none is so dramatic as the Cretaceous event.
地质记录中的其他几次大规模物种灭绝也被认为影响重大,但没有哪一次像白垩纪大灭绝那样夸张。
While there are a dozen or more mass extinctions in the geological record, the Cretaceous mass extinction has always intrigued paleontologists because it marks the end of the age of the dinosaurs.
虽然在地质记录中有十几次甚至更多的大灭绝,但白垩纪的大灭绝总是引起古生物学家的兴趣,因为它标志着恐龙时代的结束。
Geological records show that Pangea, the giant land mass that once contained the seven modern continents, broke up about 200 million years ago.
地质记录表明,现代7大陆曾经联合成一个巨大的陆地,叫做泛大陆。
Rock mass engineering geological problem of bridge site in gorge slope reflect the discrepancy between human engineering activity and engineering geological conditions.
峡谷桥位斜坡岩体工程地质问题是人类工程活动与岩体工程地质条件之间矛盾的反映。
By analyzing the geological condition in the area of the potential landslide, the contributing factor of potential landslide mass is put forward and its stability is checked.
通过对潜滑体区域地质情况的分析,指出了潜滑体的成因,并对其稳定性进行了验算,根据分析结果提出了相应的防治措。
The current code demand to select dam foundation rock by the single factor-weathering zoning of rock mass, the selected standard of the code shows too simple in complicated geological conditions.
现行规范要求按单一因素岩体风化分带来选择建基面,在复杂地质条件下规范的这一选择标准显的过于简单。
On the base of detailed analysis of the regional metallogenic geological background and geological characteristics of Sangping andalusite, the source of the metallogenic mass was studied.
在详尽分析西峡桑评红柱石矿床区域成矿地质背景及矿床基本地质特征的基础上,研究了成矿物质的来源;
The main engineering geological problems are as follows:soft soil, powder soil, welled soil (rock) , landslip, breakdown talus and broken weak rock mass.
主要的工程地质问题有:软土、粉土、膨胀土(岩)、滑坡、崩塌岩堆、岩溶、破碎软弱岩体等。
As the groundwork and environment of constructions in large scale projects, engineering rock mass is the geological structural mass composed of rock blocks and discontinuities.
工程岩体作为大型工程中建筑物的地基和建筑物的环境,是由岩石块体和非连续节理(裂隙)组成的地质结构体。
This paper, based on mass of practical work, summarizes the geological background and geological features of Jiangjiagou Gold deposit and discusses the genesis.
总结了蒋家沟金矿成矿地质背景和矿床地质特征,对矿床成因进行了探讨。
The geological conditions of Jiaojia Gold Mine are introduced, the types of engineering rock mass are classified and the methods of stope support are evaluated.
介绍了焦家金矿床的赋存地质条件,划分了工程岩体类型,介绍评价了矿山近年来应用的支护方法。
The range and process of the rock mass deformation are related to the geological conditions, blasting, and c…
岩体变形大小与变化过程还与地质条件、施工爆破、锚固等因素有关。
Shear strength value of rock mass of slope is one of the important geological factors affecting stability of slope.
边坡岩体抗剪强度参数是影响边坡稳定性的主要地质因素之一。
To emphasize and strengthen research on those problems will be helpful to know the characteristics and solve the engineering geological problems of loess mass.
认为加强和突出黄土体工程地质研究,有助于正确认识黄土体工程地质特征和解决相关的工程地质问题。
Field validation and comparative analysis between the results and the archived geological rock mass data both proved that this method has the advantage of high goodness of fit and satisfactory effect.
通过与已有地质资料的对比分析和野外实地验证,发现用该方法提取的岩体信息与实际情况吻合度高,效果较好。
It shows from study that the first section of rock system in Gai County , the shear fracture zone extending toward northwest and Wolongquan rock mass are major geological factors of ore control.
研究结果表明,盖县组一段岩石、北西向延伸的剪切破碎带以及卧龙泉岩体是主要的控矿地质因素。
To analyse the rock soil mass types and its engineering geological characteristics are the basis of harnessing environmental engineering geologies and preventing and controlling man made calamities.
分析岩土体类型及其工程地质特征,是治理环境工程地质问题、防治人为灾害的基础。
Based on the geological result of the scour pit of the Danjiangkou Project, it is expounded that rock mass characteristics are the internal factor in the formation of scour pit.
以丹江口工程冲刷坑地质调查成果为例,阐述了岩体特征是影响冲刷形成的内在因素。
The rock soil mass types and main engineering geological characteristics in Henan Province have been introduced in this paper.
本文介绍了河南省岩土体类型及其主要工程地质特征。
Based on the engineering geological conditions of the slip-mass on the left bank of Zhangfeng Reservoir, this paper puts forward the concrete design plan for the slip-mass scupper.
根据张峰水库左岸塌滑体的工程地质条件等,给出了塌滑体排水洞的具体设计方案。
It can simulate rock mass materials in a large range. It is an ideal geological mechanics model similar materials.
它可以模拟范围较广的岩体材料,是一种比较理想的地质力学模型相似材料。
Information obtained by studying on spot and data collecting indicated that the complicated geological environment would influence on the stability of the rock mass in the dam region.
但在现场调研与资料收集的基础上可以看出:研究区复杂的地质环境将对拟建坝址的工程岩体稳定性产生较大的影响。
The deformation and fracture characteristics of the surrounding rock mass are analyzed according to the geological conditions, monitoring and geophysical prospecting data, and construction process.
结合地质、监测、物探及施工资料,对地下厂房施工期围岩的变形与破坏特征进行分析。
The deformation and fracture characteristics of the surrounding rock mass are analyzed according to the geological conditions, monitoring and geophysical prospecting data, and construction process.
结合地质、监测、物探及施工资料,对地下厂房施工期围岩的变形与破坏特征进行分析。
应用推荐