• Liu9 well drilled and explored before 30 years is one engineering abandoned well with open hole which is situated at high part of fault nose structure trap in Liuzhuang oil and gas field.

    9位于刘庄油气田构造圈闭部位三十年前钻探的一口裸眼工程报废井。

    youdao

  • To economically and efficiently develop the gas field, Wells were drilled using underbalanced drilling and slim-hole drilling technology.

    根据高效低成本开发苏里格气田的要求,进行平衡小井钻井,为低成本开发苏里格气田做前期技术准备。

    youdao

  • To economically and efficiently develop the gas field, Wells were drilled using underbalanced drilling and slim-hole drilling technology.

    根据高效低成本开发苏里格气田的要求,进行平衡小井钻井,为低成本开发苏里格气田做前期技术准备。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定